Tender ID 1267153

Supply, Installation & Commissioning of 07 (Seven) nos. CP Stations (Transformer Rectifier) incorporated with online monitoring system at Bancharampur TBS, B. Baria CNG, Debidwar, Chouddagram BSCIC, Cumilla BSCIC , Cumilla Survey Institute, Brahmanbaria & Lakshmipur of BGDCL's franchise area.

Supply, Installation & Commissioning of 07 (Seven) nos. CP Stations (Transformer Rectifier) incorporated with online monitoring system at Bancharampur TBS, B. Baria CNG, Debidwar, Chouddagram BSCIC, Cumilla BSCIC , Cumilla Survey Institute, Brahmanbaria & Lakshmipur of BGDCL's franchise area.

Procurement summary

Procuring entity
Maintenance Department, Cumilla
Organization
bakhrabad gas distribution company limited
Division
energy & mineral resources division
Ministry
ministry of energy, power and mineral resources
Location
Cumilla, Cumilla
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
BG/Maint/CP/PW/2025-2026/05
Package no.
BG/Maint/CP/PW/2025-2026/05
APP ID
215591
Invitation reference no.
28.11.0000.533.05.020.26/3066 Date: 08/09/2026

Key dates

Published
15 September 2026
Document last selling date
30 September 2026
Pre-tender meeting
15 September 2026
Tender security submission deadline
1 October 2026
Opening date
1 October 2026
Closing date
1 October 2026

Costs and securities

Document price
BDT 2,500
Tender security
BDT 3,80,000

Funding

Budget type
Own Fund
Source of funds
Own Fund

Eligibility criteria

1. 1.3 or 1.4 category enlisted contractor having latest & valid enlistment with BGDCL/Petrobangla/any others company of Petrobangla having experience in CP (Impress current system) works are eligible. First class contractor having valid enlistment certificate with any Govt./Semi-Govt./ Autonomous Organization and experience in similar works will also eligible. 2. The minimum specific experience as a Prime Contractor in providing 01 (one) or multiple (max 3) contract(s) of similar nature, complexity and methods/ technology CP (Impress current) system installation of gas pipeline completed over a period of 5 (five) years with a value of at least of Tk 75 (Seventy Five) lac shall be required.