Construction of High-water Ferry ghat and Bank protection with allied works at Hatia, Noakhali (Nolchira ghat) under Chattogram Division.
Construction of High-water Ferry ghat and Bank protection with allied works at Hatia, Noakhali (Nolchira ghat) under Chattogram Division.
Procurement summary
- Procuring entity
- Office of the Superintending Engineer, Barishal Circle, Barishal
- Organization
- bangladesh inland water transport authority (biwta)
- Ministry
- ministry of shipping
- Location
- Barishal, Barishal Sadar
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- CTG-FG-01/2025-26
- Package no.
- CTG-FG-01/2025-26
- APP ID
- 225012
- Invitation reference no.
- 18.11.15.41.273.212.25/870
Key dates
- Published
- 13 September 2026
- Document last selling date
- 29 September 2026
- Pre-tender meeting
- 14 September 2026
- Tender security submission deadline
- 30 September 2026
- Opening date
- 30 September 2026
- Closing date
- 30 September 2026
Costs and securities
- Document price
- BDT 2,500
- Tender security
- BDT 4,10,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
A Contractor's firm is working in having the followings : a. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 10 (Ten) years; years counting backward from the date of publication of IFT in the newspaper. b. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 1 (one) contract(s) of (Construction/Maintenance of Ferry ghat or Bank Protection by Geotube/geobag as similar nature, complexity and methods/construction technology successfully completed within the last 05 (five) years, each with a value of at least Tk.100.00 Lakhs. c. The required average annual construction turnover under public sector shall be greater than Tk.165 lakhs over the last 5 (five) financial years; Document must be submitted along with the tender in support of average annual construction turnover. d. The min…