Construction of RCC Drain (1.50m x 1.25m) at Koituk Point to River Side, Majortila Islampur Bazar to Chanmia School, Chanmia School via Bhairabtola to Nurpur Tamabil Road Connecting Road, Major Tila Islampur Textile Road, Kumargaon R/A, Shah Khurumkhola Mazar Road via Sadikhal Road (both sides) to Tukerbazar Hospital Road, Sreerampur Main Road.
Construction of RCC Drain (1.50m x 1.25m) at Koituk Point to River Side, Majortila Islampur Bazar to Chanmia School, Chanmia School via Bhairabtola to Nurpur Tamabil Road Connecting Road, Major Tila Islampur Textile Road, Kumargaon R/A, Shah Khurumkhola Mazar Road via Sadikhal Road (both sides) to Tukerbazar Hospital Road, Sreerampur Main Road.
Procurement summary
- Procuring entity
- Engineering Department (Civil), Sylhet City Corporation.
- Organization
- sylhet city corporation
- Division
- local government division
- Ministry
- ministry of local government, rural development and co-operatives
- Location
- Sylhet, Sylhet
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- 46.07.0000.018.14.420.26
Key dates
- Published
- 27 July 2026
- Document last selling date
- 9 August 2026
- Tender security submission deadline
- 10 August 2026
- Closing date
- 10 August 2026
Costs and securities
- Document price
- BDT 5,000
- Tender security
- BDT 80,00,000
Funding
- Project
- Reducing Water Logging, supplying of pure water & Construction of infrastructure in Sylhet City Corporation Area.
- Budget type
- Development
- Development partner
- Government, Own fund
Eligibility criteria
As per Tender Data Sheet (TDS) 1. Tenderers are requested to fill different Tender Forms properly with necessary information and by uploading necessary documents, which shall be considered for tender evaluation. 2. Certificates submitted for Specific Experience must follow the standard format provided in the Particular Specification Section. If a different format is used, it must include: PE’s name, email, contact number, JV share (if any), time extensions, LD, contract amount, final bill amount, and the e-GP Tender ID. Omission of these details or wrong format will result in the tender being considered Non-responsive. 3. Turnover will be calculated on the basis of Payment Certificates issued by respective Authority. 4. In the case of liquid asset, certificate and statement from bank should be submitted, issued not earlier than the date of publication of IFT Notice in the e-GP Website. In the case of credit facilities, it should be sanctioned and must be submitted as per the format fo…