Construction of Walkway on Embankment, Walkway on R.C.C Column, Quay Wall, Bank Protection with allied works at Fatullah to Dharmaganj, Pagar to Harbaid, Ashulia to Kamarpara (Dhaka Edge) under Dhaka and Tongi River Port area.
Construction of Walkway on Embankment, Walkway on R.C.C Column, Quay Wall, Bank Protection with allied works at Fatullah to Dharmaganj, Pagar to Harbaid, Ashulia to Kamarpara (Dhaka Edge) under Dhaka and Tongi River Port area.
Procurement summary
- Procuring entity
- Office of the Project Director construction of walkway with other structures on both side of circular waterways (2nd phase)
- Organization
- bangladesh inland water transport authority (biwta)
- Ministry
- ministry of shipping
- Location
- Dhaka, Dhaka
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- RWD: 8. 15.16
- Package no.
- RWD: 8. 15.16
- APP ID
- 229853
- Invitation reference no.
- 18.11.15.41.273.37.097.24/33
Key dates
- Published
- 8 September 2026
- Document last selling date
- 29 September 2026
- Pre-tender meeting
- 8 September 2026
- Tender security submission deadline
- 30 September 2026
- Opening date
- 30 September 2026
- Closing date
- 30 September 2026
Costs and securities
- Estimated cost (APP)
- BDT 15,30,00,000
- Document price
- BDT 5,000
- Tender security
- BDT 40,00,000
Funding
- Project
- Construction & Installation of demarcation pillar, Walkway, Bank Protection, Jetty with allied work on Evicted Foreshore Land of the river Buriganga, Turag, Balu and Sitalakhya (2nd Phase)
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
Contractors in Govt., Semi-Govt. and Autonomous Govt. Agencies, who have : a. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 6 (six) years; years counting backward from the date of publication of IFT in the newspaper. b. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 1(one) contract(s) of RCC Quay wall/Walkway on RCC Column construction with under water piling complexity and methods/construction technology successfully completed within the last 5 (five) years with a value of at least Tk.10 Crores; years counting backward from the date of publication of IFT in the newspaper. c. The required average annual construction turnover under public sector shall be greater than Tk. 20 Crores over the last 5 (five) financial years; d. The minimum amount of financial resources as li…