Closed — this tender closed on 30 September 2026.

Tender ID 1321489

Construction of Walkway on Embankment, Walkway on R.C.C Column, Quay Wall, Bank Protection with allied works at Fatullah to Dharmaganj, Pagar to Harbaid, Ashulia to Kamarpara (Dhaka Edge) under Dhaka and Tongi River Port area.

Construction of Walkway on Embankment, Walkway on R.C.C Column, Quay Wall, Bank Protection with allied works at Fatullah to Dharmaganj, Pagar to Harbaid, Ashulia to Kamarpara (Dhaka Edge) under Dhaka and Tongi River Port area.

Procurement summary

Procuring entity
Office of the Project Director construction of walkway with other structures on both side of circular waterways (2nd phase)
Organization
bangladesh inland water transport authority (biwta)
Ministry
ministry of shipping
Location
Dhaka, Dhaka
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
RWD: 8. 15.16
Package no.
RWD: 8. 15.16
APP ID
229853
Invitation reference no.
18.11.15.41.273.37.097.24/33

Key dates

Published
8 September 2026
Document last selling date
29 September 2026
Pre-tender meeting
8 September 2026
Tender security submission deadline
30 September 2026
Opening date
30 September 2026
Closing date
30 September 2026

Costs and securities

Estimated cost (APP)
BDT 15,30,00,000
Document price
BDT 5,000
Tender security
BDT 40,00,000

Funding

Project
Construction & Installation of demarcation pillar, Walkway, Bank Protection, Jetty with allied work on Evicted Foreshore Land of the river Buriganga, Turag, Balu and Sitalakhya (2nd Phase)
Budget type
Development
Source of funds
Government

Eligibility criteria

Contractors in Govt., Semi-Govt. and Autonomous Govt. Agencies, who have : a. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 6 (six) years; years counting backward from the date of publication of IFT in the newspaper. b. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 1(one) contract(s) of RCC Quay wall/Walkway on RCC Column construction with under water piling complexity and methods/construction technology successfully completed within the last 5 (five) years with a value of at least Tk.10 Crores; years counting backward from the date of publication of IFT in the newspaper. c. The required average annual construction turnover under public sector shall be greater than Tk. 20 Crores over the last 5 (five) financial years; d. The minimum amount of financial resources as li…