Supply, Installation, Testing and Commissioning of 2 No. 7- Stops 1600 Kg Capacity Passenger Lift With Related Accessories at Shariatpur Government Technical School & College, Shariatpur.
Supply, Installation, Testing and Commissioning of 2 No. 7- Stops 1600 Kg Capacity Passenger Lift With Related Accessories at Shariatpur Government Technical School & College, Shariatpur.
Procurement summary
- Procuring entity
- Office of the Executive Engineer, EED, Shariatpur District.
- Organization
- education engineering department
- Division
- secondary and higher education division
- Ministry
- ministry of education
- Location
- Shariatpur, Shariatpur
- Procurement nature
- Goods
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- GD. 08
- Package no.
- GD. 08
- APP ID
- 218268
- Invitation reference no.
- EED/Desk-5/950; Date: 17/08/2026
Key dates
- Published
- 7 September 2026
- Document last selling date
- 22 September 2026
- Pre-tender meeting
- 8 September 2026
- Tender security submission deadline
- 23 September 2026
- Opening date
- 23 September 2026
- Closing date
- 23 September 2026
Costs and securities
- Document price
- BDT 4,000
- Tender security
- BDT 6,15,000
Funding
- Project
- Capacity Building for Existing 64 Technical School & College(TSC)
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
The Tenderer shall have: (a) General experience for supply and installation of lift of five (05) years (b) Specific experience of successful completion in supply, installation, testing & commissioning of lift of minimum value 135.00 Lakh Taka in a single agreement in any Govt. /semi govt. within last five years (from the date of IFT) (c) The minimum amount of liquid assets i.e working capital or credit line(s) (Form PG3-8) of the Tenderers shall be Tk 125.00 Lakh for single lift as per STD format of this tender. (d) Up to date ABC/BC License & Supervisory License issued from Electrical Licensing Board, Government of Bangladesh (e) Certificate of specific work experience obtained from organization other than EED should be authenticated by the Executive Engineer of EED after varified by respective organization (f) Submit valid Manufacturer’s Authorization letter of the proposed brand of lift Manufacturing Company.(g) Submit valid agencyship certificate of the proposed brand of lift Manu…