Part-A: Improvement of Bagaimuri - Bailabari GPS Road at Ch: 00-550m (Road ID: 419815266) (Salvage Cost Tk. 4,08,797/-), (i) Earth Work (1029.037cum), (ii) Road Work (550m), (iii) Construction of 139m Protective Work on the same road, (iv) Road Safety Work (500m), Part-B: Improvement of Baira Shafiq Chairman House-Anantapur Road at Ch: 00-840m (Road ID: 419815392) (Salvage Cost Tk.5,55,725/-), (i) Earth Work (1992.100cum), (ii) Road Work (840m), (iii) Construction of 0.90x0.90m U-Drain at Ch; 760m on the same road, (iv) Construction of 171m Protective Work on the same road, (iv) Road Safety Work (840m), Part-C: Improvement of Haydrabad Tazu Fakir bari to Shahid membar house Road at Ch: 00-800m (Road ID: 419815014) , (i) Earth Work (1415.467cum), (ii) Road Work (800m), (iii) Construction of 126m Protective Work on the same road, (iv) Road Safety Work (800m), Part-D: Improvement of Baila Bari - Tonki Road at Ch: 00-1000m (Road ID: 419815267) (Salvage Cost Tk.7,01,428/-), (i) Earth Work (2442.850cum), (ii) Road Work (1000m), (iii) Construction of 0.90x0.90m U-Drain at Ch; 597m on the same road, (iv) Construction of 99m Protective Work on the same road, (iv) Road Safety Work (1000m) under Muradnagar Upazila, District: Cumilla.
Part-A: Improvement of Bagaimuri - Bailabari GPS Road at Ch: 00-550m (Road ID: 419815266) (Salvage Cost Tk. 4,08,797/-), (i) Earth Work (1029.037cum), (ii) Road Work (550m), (iii) Construction of 139m Protective Work on the same road, (iv) Road Safety Work (500m), Part-B: Improvement of Baira Shafiq Chairman House-Anantapur Road at Ch: 00-840m (Road ID: 419815392) (Salvage Cost Tk.5,55,725/-), (i) Earth Work (1992.100cum), (ii) Road Work (840m), (iii) Construction of 0.90x0.90m U-Drain at Ch; 760m on the same road, (iv) Construction of 171m Protective Work on the same road, (iv) Road Safety Work (840m), Part-C: Improvement of Haydrabad Tazu Fakir bari to Shahid membar house Road at Ch: 00-800m (Road ID: 419815014) , (i) Earth Work (1415.467cum), (ii) Road Work (800m), (iii) Construction of 126m Protective Work on the same road, (iv) Road Safety Work (800m), Part-D: Improvement of Baila Bari - Tonki Road at Ch: 00-1000m (Road ID: 419815267) (Salvage Cost Tk.7,01,428/-), (i) Earth Work (2442.850cum), (ii) Road Work (1000m), (iii) Construction of 0.90x0.90m U-Drain at Ch; 597m on the same road, (iv) Construction of 99m Protective Work on the same road, (iv) Road Safety Work (1000m) under Muradnagar Upazila, District: Cumilla.
Procurement summary
- Procuring entity
- Office of the Executive Engineer, LGED, Cumilla
- Organization
- local government engineering department (lged)
- Division
- local government division
- Ministry
- ministry of local government, rural development and co-operatives
- Location
- Cumilla, Cumilla
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- CIDP/Murad/2026-27/W-26
- Package no.
- CIDP/Murad/2026-27/W-26
- APP ID
- 230629
- Invitation reference no.
- No: 210, Dt: 17/08/26, (IFT No. 10/2026-27)
Key dates
- Published
- 10 September 2026
- Document last selling date
- 27 September 2026
- Pre-tender meeting
- 10 September 2026
- Tender security submission deadline
- 28 September 2026
- Opening date
- 28 September 2026
- Closing date
- 28 September 2026
Costs and securities
- Estimated cost (APP)
- BDT 4,16,40,000
- Document price
- BDT 4,000
- Tender security
- BDT 12,49,000
Funding
- Project
- Important Rural Infrastructure Development Project Under Cumilla District
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
As per TDS