Closed — this tender closed on 22 September 2026.

Tender ID 1329283

Interchange Chakda Steel & Re-rolling Mills and Technosome Steel Mills 33 kV Electrical Line located near the main gate of Chakda Steel & Re-rolling Mills.

Interchange Chakda Steel & Re-rolling Mills and Technosome Steel Mills 33 kV Electrical Line located near the main gate of Chakda Steel & Re-rolling Mills.

Procurement summary

Procuring entity
Superintending Engineer, Development-1
Organization
dhaka power distribution company ltd. (dpdc)
Division
power division
Ministry
ministry of energy, power and mineral resources
Location
Dhaka, Dhaka
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
W/SE-PD-1/26-27/004
Package no.
W/SE-PD-1/26-27/004
APP ID
231806
Invitation reference no.
87.110.451.02.00.33.2025.4767

Key dates

Published
10 September 2026
Document last selling date
22 September 2026
Pre-tender meeting
10 September 2026
Tender security submission deadline
22 September 2026
Opening date
22 September 2026
Closing date
22 September 2026

Costs and securities

Estimated cost (APP)
BDT 6,00,000
Document price
BDT 500
Tender security
BDT 15,000

Funding

Budget type
Own Fund
Source of funds
Own Fund

Eligibility criteria

1. A satisfactory completion of 33 kV Underground Electriac Line Constrution Works amounting not less than Tk. 4,00,000.00 (Taka Four Lakh) in a single contract over a period of 5 (Five) years shall be required; years counting backward from the date of publication of IFT in the e-GP Portal. No partial work experience will be considered. 2. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 3,00,000.00 (Three Lakh only) which shall be supported by Recent Bank Statement (The bank statement will not be before tender publication Date in the e-GP Portlal) or Bank Solvency Certificate. Tenderer those who will submit credit facilities from the bank, they should submit Letter of Commitment for Bank’s Undertaking for line of Credit as per attached format in the document). 3. The required average annual construction turnover shall be greater than Tk.4,00,000.00 (Four Lakh) only over the last Three years (years counting backward from the date…