Installation of Permanent Cathodic Protection System for Dhanua-Mymensingh (20"OD, 58 Km long) High Pressure Gas Transmission Pipeline.
Installation of Permanent Cathodic Protection System for Dhanua-Mymensingh (20"OD, 58 Km long) High Pressure Gas Transmission Pipeline.
Procurement summary
- Procuring entity
- Pipeline Integrity Department
- Organization
- gas transmission company limited (gtcl)
- Division
- energy & mineral resources division
- Ministry
- ministry of energy, power and mineral resources
- Location
- Dhaka, Dhaka
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- 28.14.0000.000.234.55.0001.26
- Package no.
- 28.14.0000.000.234.55.0001.26
- APP ID
- 232307
- Invitation reference no.
- 28.14.0000.000.234.55.0002.26
Key dates
- Published
- 16 September 2026
- Document last selling date
- 27 September 2026
- Pre-tender meeting
- 16 September 2026
- Tender security submission deadline
- 27 September 2026
- Opening date
- 27 September 2026
- Closing date
- 27 September 2026
Costs and securities
- Estimated cost (APP)
- BDT 75,60,000
- Document price
- BDT 2,500
- Tender security
- BDT 1,70,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
1. Tenderers shall have the up-to-date valid Trade license(s). 2. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years.[Years counting backward from the date of publication of IFT on the e-GP portal]. 3. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least ONE contract of similar nature and complexity i.e., Oil/Gas Pipeline Cathodic Protection (CP) system installation/operation/maintenance/development works, CP related survey etc. as described in section 7.0 & 8.0 of tender document] successfully completed within the last 10 (Ten) years with a value of at least 44.00 (Forty-Four) Lakh. [Years counting backward from the date of publication of IFT on the eGP portal]. 4. The required average annual construction turnover under public sector shall be greater than Tk. 38…