Procurement of Repair and Maintenance Spare Parts for Air Dryer & Nitrozen Generation System of Shahjibazar 330 MW CCPP, BPDB, Habiganj.
Procurement of Repair and Maintenance Spare Parts for Air Dryer & Nitrozen Generation System of Shahjibazar 330 MW CCPP, BPDB, Habiganj.
Procurement summary
- Procuring entity
- Executive Engineer, Instrumentation & Control Maintenance Division,Shahjibazar 330MW Power Plant
- Organization
- bangladesh power development board
- Division
- power division
- Ministry
- ministry of energy, power and mineral resources
- Location
- Habiganj, Madhabpur
- Procurement nature
- Goods
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- 26-27_GR_05
- Package no.
- 26-27_GR_05
- APP ID
- 231366
- Invitation reference no.
- 27.11.3671.436.34.279.26-681; Date:16.09.2026
Key dates
- Published
- 17 September 2026
- Document last selling date
- 30 September 2026
- Pre-tender meeting
- 17 September 2026
- Tender security submission deadline
- 30 September 2026
- Opening date
- 30 September 2026
- Closing date
- 30 September 2026
Costs and securities
- Estimated cost (APP)
- BDT 10,00,000
- Document price
- BDT 500
- Tender security
- BDT 28,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
1. The tenderer must have a Valid and up to dated Trade license, TIN Certificate, VAT registration, IRC and Income Tax Certificate. 2. The minimum amount of liquid assets i.e., solid Bank Solvency/ Bank Statement/ line of credit, net of other contractual commitments is BDT 8 (Eight) lakh. 3. The minimum of years of general experience of the Tenderer in the supply of Goods and related services as Supplier shall be 6 [Six] Month, years counting backward from the date of publication of IFT in the newspaper. 4. The minimum specific experience as a Supplier in the supply of Instruments and Control Goods of at least BDT 8 (Eight) lakh under a maximum of 2 (Two) contract in the last 5 (Five) years, and successful completion of at least 1 (one) contract where DCS/PLC I/O/HMI integration was done in any government, semi-government, autonomous government, government-owned or private company. Years are counted backward from the date of publication of the IFT in the e-GP System. 5. The Tenderer m…