Strengthening of Existing Road (9.10m Width) Including Earthwork on Embankment, DBS Base Course, DBS Wearing Course And Road Marking Works from Ch. 43+010 to Ch. 43+266 of Narail-Magura Regional Highway (R-720) under Road Division, Narail during the year 2026-2027.
Strengthening of Existing Road (9.10m Width) Including Earthwork on Embankment, DBS Base Course, DBS Wearing Course And Road Marking Works from Ch. 43+010 to Ch. 43+266 of Narail-Magura Regional Highway (R-720) under Road Division, Narail during the year 2026-2027.
Procurement summary
- Procuring entity
- Narail Road Division
- Organization
- roads & highways department (rhd)
- Division
- road transport and highways division
- Ministry
- ministry of road transport and bridges
- Location
- Narail, Narail
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- e-GP/EE/NRD/Dev./01/2026-2027
Key dates
- Published
- 22 September 2026
- Document last selling date
- 6 October 2026
- Tender security submission deadline
- 7 October 2026
- Closing date
- 7 October 2026
Costs and securities
- Estimated cost (APP)
- BDT 1,81,31,936
- Document price
- BDT 2,500
- Tender security
- BDT 4,50,000
Funding
- Project
- Improvement of Magura-Narail Regional Highway (R-720) to appropriate Standard and Width including Curve Straightening
- Budget type
- Development
Eligibility criteria
a. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 ( three) years. b.The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under the public sector of at least 01 (one) contract of the same nature, complexity, and methods/construction technology successfully completed within the last 20 (twenty) years, each with a value of at least Tk. 1.00 (One) Crore. Same nature, complexity, and methods/construction technology here refers only to construction works of Flexible pavement, including Dense Bituminous Surfacing (DBS) Work . c. The required average annual construction turnover shall be greater than Tk. 1.90(One Point Nine Zero) Crore over the best 05 (Five) Financial years in the last 10 (Ten) Financial Years . d. The minimum amount of financial resources as liquid asset or working capital or credit line or sp…