Tender ID 1336076

Strengthening of Existing Road (9.10m Width) Including Earthwork on Embankment, DBS Base Course, DBS Wearing Course And Road Marking Works from Ch. 43+010 to Ch. 43+266 of Narail-Magura Regional Highway (R-720) under Road Division, Narail during the year 2026-2027.

Strengthening of Existing Road (9.10m Width) Including Earthwork on Embankment, DBS Base Course, DBS Wearing Course And Road Marking Works from Ch. 43+010 to Ch. 43+266 of Narail-Magura Regional Highway (R-720) under Road Division, Narail during the year 2026-2027.

Procurement summary

Procuring entity
Narail Road Division
Organization
roads & highways department (rhd)
Division
road transport and highways division
Ministry
ministry of road transport and bridges
Location
Narail, Narail
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
e-GP/EE/NRD/Dev./01/2026-2027

Key dates

Published
22 September 2026
Document last selling date
6 October 2026
Tender security submission deadline
7 October 2026
Closing date
7 October 2026

Costs and securities

Estimated cost (APP)
BDT 1,81,31,936
Document price
BDT 2,500
Tender security
BDT 4,50,000

Funding

Project
Improvement of Magura-Narail Regional Highway (R-720) to appropriate Standard and Width including Curve Straightening
Budget type
Development

Eligibility criteria

a. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 ( three) years. b.The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under the public sector of at least 01 (one) contract of the same nature, complexity, and methods/construction technology successfully completed within the last 20 (twenty) years, each with a value of at least Tk. 1.00 (One) Crore. Same nature, complexity, and methods/construction technology here refers only to construction works of Flexible pavement, including Dense Bituminous Surfacing (DBS) Work . c. The required average annual construction turnover shall be greater than Tk. 1.90(One Point Nine Zero) Crore over the best 05 (Five) Financial years in the last 10 (Ten) Financial Years . d. The minimum amount of financial resources as liquid asset or working capital or credit line or sp…