Supplying of Different Size Steel wire Rope, U-Clamp, Pontoon Tower Pulley & Gangway Bridge Steel Roller for using in Ferry, Pontoon, Gangway Bridge at Chandraghona Ferry ghat, under RHD, Workshop Division, Rangamati during the year-2026-2027.
Supplying of Different Size Steel wire Rope, U-Clamp, Pontoon Tower Pulley & Gangway Bridge Steel Roller for using in Ferry, Pontoon, Gangway Bridge at Chandraghona Ferry ghat, under RHD, Workshop Division, Rangamati during the year-2026-2027.
Procurement summary
- Procuring entity
- Workshop Division, Rangamati
- Organization
- roads & highways department (rhd)
- Division
- road transport and highways division
- Ministry
- ministry of road transport and bridges
- Location
- Rangamati, Rangamati
- Procurement nature
- Goods
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- e-GP/RWD-05/2026-2027
Key dates
- Published
- 28 September 2026
- Document last selling date
- 7 October 2026
- Tender security submission deadline
- 8 October 2026
- Closing date
- 8 October 2026
Costs and securities
- Estimated cost (APP)
- BDT 4,90,000
- Document price
- BDT 500
- Tender security
- BDT 12,000
Funding
- Budget type
- Revenue
Eligibility criteria
Any / All tenderers who have registered in e-GP system may participate in the tender provided that they fulfill the criteria as stated in Tender Document N.B: i) Tenderers are requested to fill different Tender Forms (Section 5: Tender and Contract Forms) properly with necessary information and by uploading necessary document(s), which will be considered for tender evaluation. ii) Tenderers are requested not to upload/ attach any unnecessary documents. 1. The Tenders shall be evaluated in the e-GP system with the help of necessary database (If Required). 2. Tenderers are requested to submit only necessary documents to qualify for eligibility criteria. They are discouraged to submit unnecessary additional documents. 3. The tender will be evaluated as per submitted documents. If any dissimilarity found in documents submitted by tenderers at any stage of evaluation process, the tenderers will be considered non-Responsive. 4. Any non submission of ongoing work or any other information tha…