Bank Protection Work along the Right Bank of Raikhali Khal at Monafer Bridge to Lal Mohammad Talukdar Para From km. 0.300 to km. 0.500 = 0.200 km Bank Protection Work along the Bank of Karnafuli River & other Connecting Khals at different locations in Boalkhali Upazila of Chattogram Districtâ?� - 1st Revised. ADP Project in Boalkhali Upazila, Dist-Chattogram Under Rangamati WD Division, BWDB, Kaptai , during the year 2026-27.
Bank Protection Work along the Right Bank of Raikhali Khal at Monafer Bridge to Lal Mohammad Talukdar Para From km. 0.300 to km. 0.500 = 0.200 km Bank Protection Work along the Bank of Karnafuli River & other Connecting Khals at different locations in Boalkhali Upazila of Chattogram Districtâ?� - 1st Revised. ADP Project in Boalkhali Upazila, Dist-Chattogram Under Rangamati WD Division, BWDB, Kaptai , during the year 2026-27.
Procurement summary
- Procuring entity
- Rangamati WD Division
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Rangamati, Kaptai
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- PR-14/ADP/2026-2027
Key dates
- Published
- 1 October 2026
- Document last selling date
- 15 October 2026
- Tender security submission deadline
- 15 October 2026
- Closing date
- 15 October 2026
Costs and securities
- Document price
- BDT 4,000
- Tender security
- BDT 9,00,000
Funding
- Project
- Bank protection work along the bank of Karnafuli River & other connecting khals at different locations in Boalkhali Upazila of Chattogram Districts
- Budget type
- Development
Eligibility criteria
1. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instructions for Tenderer: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of a work order with a decreased quantity of work. 2. Only the certificates issuing from concern PE with detail information (such as; Name of the work, executed value, duration of work, official memo no. with date) will be accepted for specific experience. 3. All non-life insurance for any Public Property, or risks or liabilities pertaining to Public Property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 4. Tender security must be payable through e-GP system only in the form of Pay Order/Bank Draft/BG from any schedule bank of Bang…