Tender ID 1345517

Installation of 06 (Six) nos Production Tube-wells, Pump House, necessary Electrical and Machanical work at Zone-1 (Tongi) Morkun T&T Bazar, Auchpara beside of Shofiuddin College Road, Khapara beside of Pond and Zone-4 (Gazipur Sadar) Chyabithi Madhob Bari, Chyabith Moddhopara and Joydebpur Bazar.

Installation of 06 (Six) nos Production Tube-wells, Pump House, necessary Electrical and Machanical work at Zone-1 (Tongi) Morkun T&T Bazar, Auchpara beside of Shofiuddin College Road, Khapara beside of Pond and Zone-4 (Gazipur Sadar) Chyabithi Madhob Bari, Chyabith Moddhopara and Joydebpur Bazar.

Procurement summary

Procuring entity
Water Division, Gazipur city corporation
Organization
gazipur city corporation
Division
local government division
Ministry
ministry of local government, rural development and co-operatives
Location
Gazipur, Gazipur city corporation
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
GCC/Water/26-27/P-04

Key dates

Published
16 October 2026
Document last selling date
8 November 2026
Tender security submission deadline
8 November 2026
Closing date
8 November 2026

Costs and securities

Estimated cost (APP)
BDT 9,81,58,611
Document price
BDT 4,000
Tender security
BDT 20,00,000

Funding

Budget type
Revenue

Eligibility criteria

01. ITT 13.1(a) The minimum number of years of the General experience of the Tenderer in the construction/supply works as Prime Contractor shall be 5 (Five years) (years counting backwards from the date of publication of IFT in the e-GP web portal) 02. ITT 13.1(b) The minimum specific experience as a Prime Contractor in construction works of at least 01 (One) contracts of Construction of 450mm X 300mm diameter Gravel Packed Deep Tube Well up to a depth of 200 m by Reverse Circulation method within any place of Bangladesh successfully completed under Public Sector within the last 05 (Five) years, with a value of at least Tk. 5,00,00,000.00 (Five Crore) only. Years counting backward from the date of publication of IFT in the newspaper. 03. ITT 14.1(b) The required average annual construction turnover i.e total certified payments received for contracts in progress or completed under public sector from a respective procuring entity shall be greater than BDT 6,84,00,000.00 over the last 05…