Tender ID 1345853

Tree Plantation at Various Locations within the Project Area in Connection with the Project "Bank Protection of Different Areas under Sonagazi & Daganbhuiyan Upazilas of Feni District from the Erosion of the Little Feni River and Feni River" under Feni Water Development Division, BWDB, Feni.

Tree Plantation at Various Locations within the Project Area in Connection with the Project "Bank Protection of Different Areas under Sonagazi & Daganbhuiyan Upazilas of Feni District from the Erosion of the Little Feni River and Feni River" under Feni Water Development Division, BWDB, Feni.

Procurement summary

Procuring entity
Feni WD Division, BWDB
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Feni, Feni
Procurement nature
Goods
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
GD-07/2026-27

Key dates

Published
7 October 2026
Document last selling date
18 October 2026
Tender security submission deadline
19 October 2026
Closing date
19 October 2026

Costs and securities

Estimated cost (APP)
BDT 6,26,000
Document price
BDT 500
Tender security
BDT 16,000

Funding

Project
Bank Protection of different areas under Sonagazi & Dagonbhuyan Upazillas of Feni District from the erosions of little Feni River and Feni River
Budget type
Development

Eligibility criteria

a) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, Vat Registration and TIN certificate. All individuals,firms who fulfill the qualifications, criteria stipulated in the tender data sheet(TDS) except the firm that has been determined to be ineligible by any government organisation. b) Vat & IT will be deducted as per the prevailing government rate. c) A detailed list of work in hand /ongoing works duly signed by the tenderer must be submitted. d) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard. e) If BWDB owned/acquired land is not sufficient to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. f) Photos and videos must be taken by the contractor from different angles of the work during prework a…