Closed — this tender closed on 25 October 2026.

Tender ID 1351816

Repair of Teesta Right Flood Control Embankment from Km. 19.500 to Km. 16.500 = 3000.00 m in Upazila: Gangachara, Dist. Rangpur in C/W "Adaptation Initiative for Climate Vulnerable Offshore Small Islands and Riverine Charland in Bangladesh Project" Under Rangpur WD Division, BWDB, Rangpur.

Repair of Teesta Right Flood Control Embankment from Km. 19.500 to Km. 16.500 = 3000.00 m in Upazila: Gangachara, Dist. Rangpur in C/W "Adaptation Initiative for Climate Vulnerable Offshore Small Islands and Riverine Charland in Bangladesh Project" Under Rangpur WD Division, BWDB, Rangpur.

Procurement summary

Procuring entity
Rangpur WD Division
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Rangpur, Rangpur City
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
P-07/2026-27

Key dates

Published
12 October 2026
Document last selling date
25 October 2026
Tender security submission deadline
25 October 2026
Closing date
25 October 2026

Costs and securities

Estimated cost (APP)
BDT 74,96,000
Document price
BDT 2,500
Tender security
BDT 2,00,000

Funding

Budget type
Revenue

Eligibility criteria

Eligibility of Tenderer : 1. Only e-GP registered Tenderers/Firms may participate. 2. Tenderers must fulfill the qualification criteria for each package as specified in the TDS and other tender documents. 3. Tenderers shall carefully read and comply with Section 2 (TDS), Section 4 (PCC) and Section 7 (General Specifications). Special Instructions: 1. Payment is subject to budget allocation and fund availability; however, work shall continue with proportionate progress. 2. Only work certificates issued by the PE for works executed with public funds shall be considered for qualification. 3. The Contractor shall arrange land/other facilities required for execution at own cost. 4. The Contractor shall bear test fees for all required tests directed by the Engineer-in-Charge. 5. Before and after execution, the Contractor shall take and submit videos/photos showing the actual work condition to the PE. 6. Taskforce guidelines and uploaded BWDB specifications shall be followed. 7. If any submi…