Repair of Teesta Right Flood Control Embankment from Km. 19.500 to Km. 16.500 = 3000.00 m in Upazila: Gangachara, Dist. Rangpur in C/W "Adaptation Initiative for Climate Vulnerable Offshore Small Islands and Riverine Charland in Bangladesh Project" Under Rangpur WD Division, BWDB, Rangpur.
Repair of Teesta Right Flood Control Embankment from Km. 19.500 to Km. 16.500 = 3000.00 m in Upazila: Gangachara, Dist. Rangpur in C/W "Adaptation Initiative for Climate Vulnerable Offshore Small Islands and Riverine Charland in Bangladesh Project" Under Rangpur WD Division, BWDB, Rangpur.
Procurement summary
- Procuring entity
- Rangpur WD Division
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Rangpur, Rangpur City
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- P-07/2026-27
Key dates
- Published
- 12 October 2026
- Document last selling date
- 25 October 2026
- Tender security submission deadline
- 25 October 2026
- Closing date
- 25 October 2026
Costs and securities
- Estimated cost (APP)
- BDT 74,96,000
- Document price
- BDT 2,500
- Tender security
- BDT 2,00,000
Funding
- Budget type
- Revenue
Eligibility criteria
Eligibility of Tenderer : 1. Only e-GP registered Tenderers/Firms may participate. 2. Tenderers must fulfill the qualification criteria for each package as specified in the TDS and other tender documents. 3. Tenderers shall carefully read and comply with Section 2 (TDS), Section 4 (PCC) and Section 7 (General Specifications). Special Instructions: 1. Payment is subject to budget allocation and fund availability; however, work shall continue with proportionate progress. 2. Only work certificates issued by the PE for works executed with public funds shall be considered for qualification. 3. The Contractor shall arrange land/other facilities required for execution at own cost. 4. The Contractor shall bear test fees for all required tests directed by the Engineer-in-Charge. 5. Before and after execution, the Contractor shall take and submit videos/photos showing the actual work condition to the PE. 6. Taskforce guidelines and uploaded BWDB specifications shall be followed. 7. If any submi…