Manufacturing, supply and installation of M.S. vertical lift gates and hoisting systems including ancillary repair and maintenance works at Ghorialdanga (Additional) 2-vent (1.52 m x 1.83 m), Siramalli 3-vent (1.52 m x 1.83 m) & Velakopa 1-vent inlet regulators of Kurigram Flood Control and Drainage Project (South Unit) of Kurigram Water Development Division under Bogura Mechanical Division, BWDB, Bogura during the FY 2026-27.
Manufacturing, supply and installation of M.S. vertical lift gates and hoisting systems including ancillary repair and maintenance works at Ghorialdanga (Additional) 2-vent (1.52 m x 1.83 m), Siramalli 3-vent (1.52 m x 1.83 m) & Velakopa 1-vent inlet regulators of Kurigram Flood Control and Drainage Project (South Unit) of Kurigram Water Development Division under Bogura Mechanical Division, BWDB, Bogura during the FY 2026-27.
Procurement summary
- Procuring entity
- Bogura ME Division
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Bogura, Bogura
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- BMD/Gate/Kurigram/OTM-06/2026-27
Key dates
- Published
- 18 October 2026
- Document last selling date
- 29 October 2026
- Tender security submission deadline
- 29 October 2026
- Closing date
- 29 October 2026
Costs and securities
- Estimated cost (APP)
- BDT 10,60,000
- Document price
- BDT 1,000
- Tender security
- BDT 28,000
Funding
- Budget type
- Revenue
Eligibility criteria
e-GP Registration: All Tenderers must be registered with CPTU through the National e-GP portal. Tender Costs: No compensation or fees will be provided for the preparation and submission of the tender offer. PE Rights: The Procuring Entity (PE) reserves the right to completely cancel the work or reduce the final bill amount without assigning any reason. Scope Variations: The final scope of work and contract price may be reduced depending on actual field conditions. Payment Conditions: Payment will be made strictly subject to the allocation and availability of funds. Visual Documentation: The successful contractor must capture and submit clear photographic and video records of the work at three distinct stages (before starting, during execution, and after completion) to the office of the Executive Engineer at their own cost. Other Conditions: All other qualification criteria and governing terms are detailed in the Tender Documents.