Installation work of air conditioning system and medical gas system (oxygen and suction lines) under the project titled Upgradation of existing kidney dialysis centers in medical college hospitals to 50 beds and establishment of 10 bed kidney dialysis centers in district Sadar hospitals (2nd Revised). (Sub-head- Supply and installation work of air conditioning system in the existing kidney dialysis center at Faridpur Medical College Hospital).
Installation work of air conditioning system and medical gas system (oxygen and suction lines) under the project titled Upgradation of existing kidney dialysis centers in medical college hospitals to 50 beds and establishment of 10 bed kidney dialysis centers in district Sadar hospitals (2nd Revised). (Sub-head- Supply and installation work of air conditioning system in the existing kidney dialysis center at Faridpur Medical College Hospital).
Procurement summary
- Procuring entity
- Faridpur PWD Division
- Organization
- public works department (pwd)
- Ministry
- ministry of housing and public works
- Location
- Faridpur, Faridpur
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- W-14/Faridpur/Kidney/dialysis/2026-27
Key dates
- Published
- 28 October 2026
- Document last selling date
- 8 November 2026
- Tender security submission deadline
- 8 November 2026
- Closing date
- 8 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 26,59,000
- Document price
- BDT 1,500
- Tender security
- BDT 75,000
Funding
- Project
- Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)
- Budget type
- Development
Eligibility criteria
1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 5 years. 2. The minimum specific experience as a Prime Contractor in construction works under public sector of at least 01 contract of Supply and installation work of air conditioning system successfully completed within the last 5 years each with a value of at least Tk. 18.00 (Eighteen) Lac. 3. The required average annual construction turnover under public sector shall be greater than Tk. 18.00 (Lac) over the last 5 financial years. 4. The minimum amount of financial resources as liquid asset or credit line(s) or specific credit commitment of the Tenderers shall be Tk. 20.00 (Twenty) Lac must be submitted in a prescribed form i.e ePW2A-8 form published by BPPA without any alterations. 5. The Tender minimum capacity shall be: Tk. 17.00 (Seventeen) Lac. 6. Manufacturer authorization document must be submitted from the manufacturing company with valid email address…