WD-40:CONSTRUCTION OF 5-STORIED TEACHER'S DORMITORY WITH 5-STORIED FOUNDATION INC/ SANITARY AND WATER SUPPLY WORKS ALONG WITH ELECTRIFICATION AND OTHER WORKS AT CHATTOGRAM POLYTECHNIC INSTITUTE.
WD-40:CONSTRUCTION OF 5-STORIED TEACHER'S DORMITORY WITH 5-STORIED FOUNDATION INC/ SANITARY AND WATER SUPPLY WORKS ALONG WITH ELECTRIFICATION AND OTHER WORKS AT CHATTOGRAM POLYTECHNIC INSTITUTE.
Procurement summary
- Procuring entity
- Office of the Executive Engineer,EED, Chittagong, District.
- Organization
- education engineering department
- Division
- secondary and higher education division
- Ministry
- ministry of education
- Location
- Chattogram, Chittagong
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- 15Poly/2026-27/WD-40
- Package no.
- 15Poly/2026-27/WD-40
- APP ID
- 228901
- Invitation reference no.
- 37.07.0000.017.19.063.25.26/87; Date: 19/10/2026
Key dates
- Published
- 3 November 2026
- Document last selling date
- 29 November 2026
- Pre-tender meeting
- 4 November 2026
- Tender security submission deadline
- 30 November 2026
- Opening date
- 30 November 2026
- Closing date
- 30 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 5,10,00,000
- Document price
- BDT 4,000
- Tender security
- BDT 11,00,000
Funding
- Project
- Capacity Building 15 Government Polytechnic Institutes
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
Experience Criteria: (a) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 05 (Five) years [years counting backward from the date of publication of IFT in the newspaper]. (b) The minimum specific experience as a Prime Contractor in construction works of at least 01 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 05 (five) years, with a value of at least BDT 260.00 (Two Thousand Sixty) lakhs [ years counting backward from the date of publication of IFT in the newspaper]. Financial Criteria: (c) The required average annual construction turnover shall be greater than BDT 350.00 (Three Hundred Fifty) Lakh per year during the last 05(five) years, totaling BDT 1750.00 lakh (350 x 5 = 1750 Lakh [years counting backward from the date of publication of IFT in the newspaper]. (d) The minimum amounts of Liquid Assets shall be at BDT 85.00 (Eighty Five) La…