Tender ID 1363141

WD-40:CONSTRUCTION OF 5-STORIED TEACHER'S DORMITORY WITH 5-STORIED FOUNDATION INC/ SANITARY AND WATER SUPPLY WORKS ALONG WITH ELECTRIFICATION AND OTHER WORKS AT CHATTOGRAM POLYTECHNIC INSTITUTE.

WD-40:CONSTRUCTION OF 5-STORIED TEACHER'S DORMITORY WITH 5-STORIED FOUNDATION INC/ SANITARY AND WATER SUPPLY WORKS ALONG WITH ELECTRIFICATION AND OTHER WORKS AT CHATTOGRAM POLYTECHNIC INSTITUTE.

Procurement summary

Procuring entity
Office of the Executive Engineer,EED, Chittagong, District.
Organization
education engineering department
Division
secondary and higher education division
Ministry
ministry of education
Location
Chattogram, Chittagong
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
15Poly/2026-27/WD-40
Package no.
15Poly/2026-27/WD-40
APP ID
228901
Invitation reference no.
37.07.0000.017.19.063.25.26/87; Date: 19/10/2026

Key dates

Published
3 November 2026
Document last selling date
29 November 2026
Pre-tender meeting
4 November 2026
Tender security submission deadline
30 November 2026
Opening date
30 November 2026
Closing date
30 November 2026

Costs and securities

Estimated cost (APP)
BDT 5,10,00,000
Document price
BDT 4,000
Tender security
BDT 11,00,000

Funding

Project
Capacity Building 15 Government Polytechnic Institutes
Budget type
Development
Source of funds
Government

Eligibility criteria

Experience Criteria: (a) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 05 (Five) years [years counting backward from the date of publication of IFT in the newspaper]. (b) The minimum specific experience as a Prime Contractor in construction works of at least 01 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 05 (five) years, with a value of at least BDT 260.00 (Two Thousand Sixty) lakhs [ years counting backward from the date of publication of IFT in the newspaper]. Financial Criteria: (c) The required average annual construction turnover shall be greater than BDT 350.00 (Three Hundred Fifty) Lakh per year during the last 05(five) years, totaling BDT 1750.00 lakh (350 x 5 = 1750 Lakh [years counting backward from the date of publication of IFT in the newspaper]. (d) The minimum amounts of Liquid Assets shall be at BDT 85.00 (Eighty Five) La…