Re-sectioning of embankment with slope protection work from Km. 9.300 to Km 9.720= 0.420 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla, Chattogram" under Chittagong WD Division-2, BWDB, Chittagong.
Re-sectioning of embankment with slope protection work from Km. 9.300 to Km 9.720= 0.420 Km under the project "Permanent Rehabilitation of Damaged Embankment with Slope Protection work of Polder No-72 in Sandwip Upazilla, Chattogram" under Chittagong WD Division-2, BWDB, Chittagong.
Procurement summary
- Procuring entity
- Chattogram WD Division -2
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Chattogram, Chattogram
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- W-CTG-2/SPW-6/R
- Package no.
- W-CTG-2/SPW-6/R
- APP ID
- 235092
- Invitation reference no.
- 42.01.1500.582.07.020.26.1555, Date: 02-11-2026
Key dates
- Published
- 2 November 2026
- Document last selling date
- 23 November 2026
- Pre-tender meeting
- 3 November 2026
- Tender security submission deadline
- 24 November 2026
- Opening date
- 24 November 2026
- Closing date
- 24 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 16,70,24,000
- Document price
- BDT 5,000
- Tender security
- BDT 40,00,000
Funding
- Project
- Permanent Rehabilitation of damaged embankment with slope protection work of Polder No-72 at Sandwip upazila of Chattogram district.
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
1. All the tenderers/firms must be registered with CPTU through e-GP portal. 2. All individual(s)/firm(s)/ who fulfill the qualification(s) criteria as stipulated in the Tender Data Sheet (TDS) except the firm that has been determined to be ineligible by BWDB or any other government organization. Special Instruction: 1. The work may be totally dropped, decreased or increased. No claim or extra rate will be entertained for cancellation of the tender or issuance of work order with decreased quantity of work. 2. The Tenderers will visit and examine the Site with his own responsibility and expenses and obtain all information that may be necessary for preparing the Tender and entering into a Contract for performance of the works. 3. Tenderers must submit all requisite documents mentioned in tender data sheet. Failing to comply with the requirements, the tender will be summarily rejected. 4. Liquid asset certificate must be submitted in the prescribed format attached in section 7 (General S…