Procurement of Cooling fan and Equipment/device for Valve cooling system at BIpTC Bheramara kushtia Under HVDC Circle Ishurdi.
Procurement of Cooling fan and Equipment/device for Valve cooling system at BIpTC Bheramara kushtia Under HVDC Circle Ishurdi.
Procurement summary
- Procuring entity
- HVDC Circle
- Organization
- power grid bangladesh plc
- Division
- power division
- Ministry
- ministry of energy, power and mineral resources
- Location
- Pabna, Pabna
- Procurement nature
- Goods
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- 27.21.0000.735.07.029.26. 462 Date: 29/10/2026
- Package no.
- 27.21.0000.735.07.029.26. 462 Date: 29/10/2026
- APP ID
- 230080
- Invitation reference no.
- 27.21.0000.735.07.029.26. 462 Date: 29/10/2026
Key dates
- Published
- 11 November 2026
- Document last selling date
- 2 December 2026
- Pre-tender meeting
- 11 November 2026
- Tender security submission deadline
- 2 December 2026
- Opening date
- 3 December 2026
- Closing date
- 3 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 34,96,520
- Document price
- BDT 1,500
- Tender security
- BDT 50,000
Funding
- Budget type
- Own Fund
- Source of funds
- Own Fund
Eligibility criteria
1. A minimum of three (03) years of general experience in the supply of electrical equipment is required. Eligibility is determined by counting backward from the official IFT publication date with in the newspaper. 2.The minimum specific experience as Supplier in supply of Electrical Goods/ Similar Goods of at least 1 contract(s) successfully completed within the last 03(three) years, value of at least Tk 18.0(eighteen) lac minimum . Years counting backward from the date of publication of IFT in the newspaper. 3. The minimum amount of liquid assets or working capital or credit facilities of the Tender shall be Tk 33.0(thirty three) lac. 4.To ensure seamless integration, Cooling fan and Equipment/device for Valve cooling system must maintain 100% compatibility with the current system’s GA drawings and physical dimensions. Non-compliant submissions shall be deemed technically unresponsive and subject to summary rejection. 5. The offered Cooling fan and Equipment/device for Valve cooling…