Construction of RCC Pipe Drain Work at Gozaria Para Road Habitus Factory to Bangla Bazar Main Road Culvert Via Asian Paint Factory.
Construction of RCC Pipe Drain Work at Gozaria Para Road Habitus Factory to Bangla Bazar Main Road Culvert Via Asian Paint Factory.
Procurement summary
- Procuring entity
- Zone-05,Gazipur city corporation
- Organization
- gazipur city corporation
- Division
- local government division
- Ministry
- ministry of local government, rural development and co-operatives
- Location
- Gazipur, Gazipur city corporation.
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- GCC/Z-05/T-02/26-27/R-03
- Package no.
- GCC/Z-05/T-02/26-27/R-03
- APP ID
- 227661
- Invitation reference no.
- 46.19.0005.051.99.137.26-3661; Date: 10/11/2026
Key dates
- Published
- 10 November 2026
- Document last selling date
- 2 December 2026
- Pre-tender meeting
- 10 November 2026
- Tender security submission deadline
- 2 December 2026
- Opening date
- 2 December 2026
- Closing date
- 2 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 6,85,00,000
- Document price
- BDT 4,000
- Tender security
- BDT 19,50,000
Funding
- Budget type
- Own Fund
- Source of funds
- Own Fund
Eligibility criteria
ITT 13.1(a) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be equal or more than 5 (Five years) (years counting backward from the date of publication of IFT in the e-GP web portal) Only Work Completiont certificates shall be considered for general experience. ITT 13.1(b) The minimum specific experience as a Prime Contractor in construction works under public sector of at least 01 (One) contract of similar nature (RCC Pipe Drain Work) successfully completed within the last 05 (five) years, each with a value of at least BDT. 3,90,00,000.00 ( Three crore Ninety lac only) years counting backward from the date of publication of IFT in the e-GP web portal) ITT 14.1(b) The required average annual construction turnover i.e total certified payments received for contracts in progress or completed under public sector from respective procuring entity shall be greater than 5,00,00,000.00 (Five crore only) over the last 05 (Five…