Installation of electrical equipment/ air condition system under the project titled "Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)"
Installation of electrical equipment/ air condition system under the project titled "Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)"
Procurement summary
- Procuring entity
- Narail PWD Division
- Organization
- public works department (pwd)
- Ministry
- ministry of housing and public works
- Location
- Narail, Narail
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- health/2026-27/kidney dialysis/W-54
- Package no.
- health/2026-27/kidney dialysis/W-54
- APP ID
- 235783
- Invitation reference no.
- health/2026-27/kidney dialysis/W-54
Key dates
- Published
- 12 November 2026
- Document last selling date
- 25 November 2026
- Pre-tender meeting
- 12 November 2026
- Tender security submission deadline
- 26 November 2026
- Opening date
- 26 November 2026
- Closing date
- 26 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 11,93,746
- Document price
- BDT 1,000
- Tender security
- BDT 30,000
Funding
- Project
- Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 5 (Five) years. ii) The minimum specific experience as a Prime Contractor of at least 01 contract of supply and installation of air cooler successfully completed within the last 5 years, with a value of at least Tk 8,50,000.00 (NB: years counting backward from the date of publication of IFT in the Newspaper). a) In case of the work done under any Government/ Semi-Government/ Autonomous Bodies/ Private Organization other than PWD the certifying authority shall be an officer not below the rank of Executive Engineer. b) In case of the work done under Private Organization shall be verified by Executive Engineer of concerned PWD Division. iii) The required average annual construction turnover under public sector shall be greater than Tk 8,00,000.00 over the best 3 years in the last 5 financial years. iv) The minimum amount of financial resources as liquid asset or workin…