Tender ID 1371769

Installation of electrical equipment/ air condition system under the project titled "Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)"

Installation of electrical equipment/ air condition system under the project titled "Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)"

Procurement summary

Procuring entity
Narail PWD Division
Organization
public works department (pwd)
Ministry
ministry of housing and public works
Location
Narail, Narail
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
health/2026-27/kidney dialysis/W-54
Package no.
health/2026-27/kidney dialysis/W-54
APP ID
235783
Invitation reference no.
health/2026-27/kidney dialysis/W-54

Key dates

Published
12 November 2026
Document last selling date
25 November 2026
Pre-tender meeting
12 November 2026
Tender security submission deadline
26 November 2026
Opening date
26 November 2026
Closing date
26 November 2026

Costs and securities

Estimated cost (APP)
BDT 11,93,746
Document price
BDT 1,000
Tender security
BDT 30,000

Funding

Project
Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)
Budget type
Development
Source of funds
Government

Eligibility criteria

The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 5 (Five) years. ii) The minimum specific experience as a Prime Contractor of at least 01 contract of supply and installation of air cooler successfully completed within the last 5 years, with a value of at least Tk 8,50,000.00 (NB: years counting backward from the date of publication of IFT in the Newspaper). a) In case of the work done under any Government/ Semi-Government/ Autonomous Bodies/ Private Organization other than PWD the certifying authority shall be an officer not below the rank of Executive Engineer. b) In case of the work done under Private Organization shall be verified by Executive Engineer of concerned PWD Division. iii) The required average annual construction turnover under public sector shall be greater than Tk 8,00,000.00 over the best 3 years in the last 5 financial years. iv) The minimum amount of financial resources as liquid asset or workin…