Supply and Installation of Rooftop Solar at Sirajganj Power Station
Supply and Installation of Rooftop Solar at Sirajganj Power Station
Procurement summary
- Procuring entity
- Office of the Chief Engineer, Sirajganj Power Station
- Organization
- north-west power generation company limited
- Division
- power division
- Ministry
- ministry of energy, power and mineral resources
- Location
- Sirajganj, Sirajganj
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- NW-CE-SPS-W-PM-26-MIS-01
- Package no.
- NW-CE-SPS-W-PM-26-MIS-01
- APP ID
- 230912
- Invitation reference no.
- 27.28.8878.000.004.07.0001.21
Key dates
- Published
- 18 November 2026
- Document last selling date
- 13 December 2026
- Pre-tender meeting
- 19 November 2026
- Tender security submission deadline
- 13 December 2026
- Opening date
- 13 December 2026
- Closing date
- 13 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 4,08,48,000
- Document price
- BDT 4,000
- Tender security
- BDT 11,00,000
Funding
- Budget type
- Own Fund
- Source of funds
- Own Fund
Eligibility criteria
Tenderers shall have the following up to date valid licenses: Trade License VAT Registration Income Tax Certificate General Experience of Minimum 3 years in electrical construction works, or renewable energy works. which shall be supported by the End-User Certificate in the Letter Head Pad of Purchaser duly signed and sealed with contact details mentioning Contract Value, Type of Supply, Date of Supply. [Years will be counted backward from the date of publication of IFT in the e-GP System] Specific Experience of At least one (1) contract of grid-tied Solar PV Power Plant (minimum 500 kWp capacity or value of at least BDT 2.1 Crore) successfully completed under public sector within the last 5 years. which shall be supported by the End-User Certificate in the Letter Head Pad of Purchaser duly signed and sealed with contact details mentioning Contract Value, Type of Supply, Date of Supply. [Years will be counted backward from the date of publication of IFT in the e-GP System] The Average…