Tender ID 1373131

Construction of Kulia P.C Girder Bridge [72.950m] at 13th Km, Parulia P.C Girder Bridge [34.880m] at 18th Km & RCC U-Drain at Bazar areas of Satkhira-Sokhipur-Kaligonj (Z-7602) Road and Widening of Bongshipur intersection and Construction of RCC U-Drain at Bazar areas of Kaliganj - Shyamnagar - Vetkhali (Z-7617) Road under Road Division Satkhira during the Year 2026-2027.

Construction of Kulia P.C Girder Bridge [72.950m] at 13th Km, Parulia P.C Girder Bridge [34.880m] at 18th Km & RCC U-Drain at Bazar areas of Satkhira-Sokhipur-Kaligonj (Z-7602) Road and Widening of Bongshipur intersection and Construction of RCC U-Drain at Bazar areas of Kaliganj - Shyamnagar - Vetkhali (Z-7617) Road under Road Division Satkhira during the Year 2026-2027.

Procurement summary

Procuring entity
Satkhira Road Division
Organization
roads & highways department (rhd)
Division
road transport and highways division
Ministry
ministry of road transport and bridges
Location
Satkhira, Satkhira
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
e-GP/02/ADP/OTM/Sat/RHD/2026-2027/WP-09
Package no.
e-GP/02/ADP/OTM/Sat/RHD/2026-2027/WP-09
APP ID
235991
Invitation reference no.
APP ID : 235991

Key dates

Published
24 November 2026
Document last selling date
22 December 2026
Pre-tender meeting
24 November 2026
Tender security submission deadline
23 December 2026
Opening date
23 December 2026
Closing date
23 December 2026

Costs and securities

Estimated cost (APP)
BDT 82,00,00,000
Document price
BDT 7,000
Tender security
BDT 1,64,00,000

Funding

Project
Improvement of Satkhira-Shakipur-Kaliganj (Z-7602) And Kaliganj-Shyamnagar-Vetkhali (Z-7617) Highway to Appropriate Level of Standard.
Budget type
Development
Source of funds
Government

Eligibility criteria

1) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years. 2) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in Construction of PC/RCC Bridge work with Flexible pavement including DBS Surfacing Work under the public sector successfully completed within the last 20 (twenty) years with a value of at least Tk. 41 (Forty One) Crore in Maximum 02 (Two) contracts. However, The Construction of Flexible pavement including DBS Surfacing Work experience may be in the same contract or a separate contract. 3) The required average annual construction turnover shall be greater than Tk 55.00 (Fifty Five) crore over the best Five [5] financial years in the last Ten [10] financial years. 4) The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combina…