Bridge Periodic Maintenance Programme by Construction of 22.68 m long (1 x 21.34m) R.C.C Girder Mohorkona Bridge at 6th Km (Ch. 5+692m on Netrokona-Birishiri Road (Z-3709) under Netrokona Road Division during the year 2026-2027
Bridge Periodic Maintenance Programme by Construction of 22.68 m long (1 x 21.34m) R.C.C Girder Mohorkona Bridge at 6th Km (Ch. 5+692m on Netrokona-Birishiri Road (Z-3709) under Netrokona Road Division during the year 2026-2027
Procurement summary
- Procuring entity
- Road Division Netrokona
- Organization
- roads & highways department (rhd)
- Division
- road transport and highways division
- Ministry
- ministry of road transport and bridges
- Location
- Netrokona, Netrokona
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- e-GP/NRD/PMP-Bridge/Culvert/05/2026-2027
- Package no.
- e-GP/NRD/PMP-Bridge/Culvert/05/2026-2027
- APP ID
- 229288
- Invitation reference no.
- e-GP/NRD/PMP-Bridge/Culvert/05/2026-2027
Key dates
- Published
- 19 November 2026
- Document last selling date
- 20 December 2026
- Pre-tender meeting
- 19 November 2026
- Tender security submission deadline
- 21 December 2026
- Opening date
- 21 December 2026
- Closing date
- 21 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 6,64,45,500
- Document price
- BDT 4,000
- Tender security
- BDT 16,00,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
All/Any tenderers enlisted in e-GP system except Israel may participate in the tender provided that they fulfil the criteria as stated in Tender Document. The fo lowing conditions shal be considered: 1. The Tenders shal be evaluated in the e-GP system with the help of necessary database (If Required). 2. Tenderers are requested to submit only necessary documents to qualify for eligibility criteria. They are discouraged tosubmit unnecessary additional documents. 3.The tender wil be evaluated as per submitted documents. If any dissimilarity found in documents submitted by tenderers at any stage of evaluation process, the tenderers wil be considered non-Responsive. 4. Any non submission of ongoing work or any other information that affect thetender evaluation wil be considered as non-eligibility of the tenderer. 5. The tenderers wil have to submit year wise payment list in individual folder. 6. The tenderers wil have to submit list of ongoing works of RHD/other organization in individual…