Re-sectioning of embankment with slope protection work from km 12.100 to km 12.850 = 0.750 km of Polder no. 56/57 in connection with "Protection of Shibpur, Dhonia and Madua Area under Bhola Sadar and Daulatkhan Upazila from Erosion of the Meghna River" under Bhola WD Division-I, BWDB, Bhola. (DSM-ESP -21)
Re-sectioning of embankment with slope protection work from km 12.100 to km 12.850 = 0.750 km of Polder no. 56/57 in connection with "Protection of Shibpur, Dhonia and Madua Area under Bhola Sadar and Daulatkhan Upazila from Erosion of the Meghna River" under Bhola WD Division-I, BWDB, Bhola. (DSM-ESP -21)
Procurement summary
- Procuring entity
- Bhola WD Division-1
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Bhola, Bhola
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- DSM-ESP-21
- Package no.
- DSM-ESP-21
- APP ID
- 235392
- Invitation reference no.
- T-2/549, Dated:17-11-26
Key dates
- Published
- 24 November 2026
- Document last selling date
- 24 December 2026
- Pre-tender meeting
- 24 November 2026
- Tender security submission deadline
- 24 December 2026
- Opening date
- 24 December 2026
- Closing date
- 24 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 21,37,33,918
- Document price
- BDT 5,000
- Tender security
- BDT 45,00,000
Funding
- Project
- Protection of Shibpur, Dhonia and Madua Area under Bhola Sadar and Daulatkhan Upazila from Erosion of the Meghna River
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
1) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, VAT Registration and TIN certificate. 2) Payment shall be made subject to availability of fund. 3) All Non-life insurance for any public property, or risks or liabilities pertaining to public property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 4) It is the duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not be able to open the file, no claim from the tenderer will be entertained regarding the file. 5) A detailed list of work in hand/on-going works duly signed by the tenderer must be submitted. 6) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard. 7) If BWDB o…