Supply and Installation Work of LED Display Panel at International Airports of Bangladesh.
Supply and Installation Work of LED Display Panel at International Airports of Bangladesh.
Procurement summary
- Procuring entity
- Wage Earners' Welfare Board
- Organization
- wage earners' welfare board (wewb)
- Ministry
- ministry of expatriates' welfare and overseas employment
- Location
- Dhaka, Dhaka
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- WEWB/WD-8/26-27
- Package no.
- WEWB/WD-8/26-27
- APP ID
- 227429
- Invitation reference no.
- 49.04.0000.000.009.07.0006.26-993
Key dates
- Published
- 23 November 2026
- Document last selling date
- 7 December 2026
- Pre-tender meeting
- 23 November 2026
- Tender security submission deadline
- 7 December 2026
- Opening date
- 7 December 2026
- Closing date
- 7 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 26,00,000
- Document price
- BDT 1,500
- Tender security
- BDT 65,000
Funding
- Budget type
- Own Fund
- Source of funds
- Own Fund
Eligibility criteria
a) The minimum number of years of general experience of the Tenderer in the construction works shall be 03years ; years counting backward from the date of publication. b) The minimum specific experience in same nature works of at least 01 number contract(s) of successfully completed within the last 03 yearsany government / Semi government / Autonomousorganization, each with a value of at leastTk. 13 Lac ; years counting backward from the date of publication. c) The required average annual construction turnover shall be greater thanTk.13Lacover the last 02 yearswith audit report document; d) The minimum amount of liquid assets i.e. working capital or credit line(s) of the Tenderer shall be Tk.4 Lac. e) The minimum capacity shall be: Tk. 15Lac; the following formula shall be used to calculate the Tender capacity (Tender capacity = A x N x 1.25 - B). NB: A=Maximum Value of Works performed in any one year during last 02years. N=Completion time of the proposed work in years. B=Value of Exi…