Repair and Maintenance of Electrical Works (Work Consisting of Supply and installation of 100 KVA Generator, AC and IP Bullet CAMERA ,IPS, IPS Battery, Ceiling fans, lights, and fire extinguishers and other associated and ancillary works) at Saidpur 100 Bed Hospital in Nilphamari District.
Repair and Maintenance of Electrical Works (Work Consisting of Supply and installation of 100 KVA Generator, AC and IP Bullet CAMERA ,IPS, IPS Battery, Ceiling fans, lights, and fire extinguishers and other associated and ancillary works) at Saidpur 100 Bed Hospital in Nilphamari District.
Procurement summary
- Procuring entity
- HED, Rangpur Division, Rangpur
- Organization
- health engineering department (hed)
- Ministry
- ministry of health and family welfare
- Location
- Rangpur, Rangpur
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- HED/RANG/HSD/REPAIR/26-27/09
- Package no.
- HED/RANG/HSD/REPAIR/26-27/09
- APP ID
- 234141
- Invitation reference no.
- 45.02.8549.431.07.009.26-525, Date:24.11.2026
Key dates
- Published
- 24 November 2026
- Document last selling date
- 8 December 2026
- Pre-tender meeting
- 25 November 2026
- Tender security submission deadline
- 9 December 2026
- Opening date
- 9 December 2026
- Closing date
- 9 December 2026
Costs and securities
- Document price
- BDT 1,500
- Tender security
- BDT 1,00,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
This invitation for tender is open to all eligible/ Bona fide Tenderers: Up to date valid Trade license Valid TIN & VAT registration Certificate Up to date valid Income Tax clearance certificate The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05 (Five) years. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works under public sector of at least 01 contract of Electrical Works successfully completed within the last 05 years, with a value of at least Tk. 25.00 Lac The required average annual construction turnover under public sector shall be greater than Tk 25.00 Lac over the last 05 financial years and Minimum Tender Capacity shall be 25.00 Lac. The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment in the form of Letter of Credit Commitment…