Tender ID 1380360

Supply, Installation, Testing & commissioning of Air-Cooler System at 10 Bed Kidney & Dialysis Unit at 250 bed hospital in Habiganj.FY:2026-27

Supply, Installation, Testing & commissioning of Air-Cooler System at 10 Bed Kidney & Dialysis Unit at 250 bed hospital in Habiganj.FY:2026-27

Procurement summary

Procuring entity
Hobiganj PWD Division
Organization
public works department (pwd)
Ministry
ministry of housing and public works
Location
Habiganj, Hobiganj
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
habiganj/kidneydialysis/W-66
Package no.
habiganj/kidneydialysis/W-66
APP ID
236245
Invitation reference no.
hobi/app/sd-em/memo

Key dates

Published
24 November 2026
Document last selling date
6 December 2026
Pre-tender meeting
24 November 2026
Tender security submission deadline
7 December 2026
Opening date
7 December 2026
Closing date
7 December 2026

Costs and securities

Document price
BDT 1,000
Tender security
BDT 30,000

Funding

Project
Upgradation of the Existing Kidney Dialysis Centre of Medical College Hospitals up to 50 beds and Establishment of 10 bedded Kidney Dialysis Centre at District Hospitals (2nd revised)
Budget type
Development
Source of funds
Government

Eligibility criteria

This invitation for Tender is open to all eligible Tenderers as mentioned below: 1.The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor, Subcontractor or Management Contractor shall be 05 (five) years. 2. The minimum specific experience as Prime Contractor, Subcontractor, or Management Contractor in similar nature of electro mechanical works successfully completed within the last 05 (five) years with a value of at least Tk. 7.00 (Seventy) Lac in a single contract under the public sector of Bangladesh. 3. The required average annual construction turnover shall be greater than Tk. 12.00 (Twelve) Lac in the last 5 (Five) years. Payment certificates for contracts in progress or completed under the public sector during the last 05 (five) years must be submitted along with the tender in support of average annual construction turnover. 4. The Tenderer must have a minimum liquid assets/working capital/credit facilities (in the e-PW2A-…