Construction and Rehabilitation of 4-Lane Rigid Pavement, Roadside Drain, Retaining Wall, Electrification and Tree Plantation of Sonadanga Bypass Road under KCC (CCAUD II Project) Funded by KfW. i. From PK 0+390 to PK 0+792: Construction of four-lane highway with rigid pavement including a 1.0m median for multiple use (Street lights / trees); and ii. Construction of both side footpath including road site drainage including improved catch basins, Maintenance Covers and outlet structure to Moyur river.
Construction and Rehabilitation of 4-Lane Rigid Pavement, Roadside Drain, Retaining Wall, Electrification and Tree Plantation of Sonadanga Bypass Road under KCC (CCAUD II Project) Funded by KfW. i. From PK 0+390 to PK 0+792: Construction of four-lane highway with rigid pavement including a 1.0m median for multiple use (Street lights / trees); and ii. Construction of both side footpath including road site drainage including improved catch basins, Maintenance Covers and outlet structure to Moyur river.
Procurement summary
- Procuring entity
- Chief Planning Officer at Office of CPO, Khulna City Corporation
- Procurement nature
- Works
- Procurement type
- NCT
- Location
- Khulna, khulna
- Closing date
- 31 August 2026
Eligibility criteria
Eligibility as per the tender document, among others: ITT/TDS Cl 5; GCC/PCC Cl. 9; DP ITT Amendments and DPP Forms This project is part of the CCAUDP Phase II, aimed at enhancing urban resilience in Khulna through critical infrastructure improvements. In total 9 projects as NCB using eGP Form and 1 project as ICB using KFW SBD with a total volume of 30 Million EUR will be tendered. The key focus areas of these projects include stormwater management, riverbank erosion protection, the rehabilitation of communal green/blue spaces, and the strengthening of public infrastructure to mitigate the impacts of climate change. The tender shall be considered non-responsive and the Tenderer shall be excluded if any of the documents listed in Section 2 TDS, Cl 23.1 (m) are not submitted, or if they are submitted incompletely. Specific reference is made to the following: - Signed & Upload “Specification for ESHS Management of Works” (Section 9 ES Specifications) - Signed & Upload Form e-PW3D-DP-A De…