Bangladesh procurement knowledge center

Tender Preparation & Participation Guidance

Practical guidance on the Public Procurement Rules 2025 and the e-GP system: BPPA's standard tender documents (STDs), thresholds, eligibility checks, and step-by-step instructions to prepare and take part in Bangladesh public procurement.

PPR 2025, effective 28 Sep 2025 Government and bidder views Matches the e-GP STD list
Live library Total Guidance Articles28Complete procurement guidance library.
STD indexed Standard Tender Documents28Searchable STD and form references.
How e-GP tendering works

Six steps from notice to contract

Every PPR 2025 tender follows the same path in the e-GP system. Pick your role to see what to check at each step and where to find help.

  1. Step 1: Keep your e-GP registration active

    Tenders are submitted only through the e-GP system, so your tenderer account must be active, renewed and authorized before the deadline.

    What to check
    • Trade license, TIN and VAT/BIN details match your company records.
    • The registration is renewed before it expires, not on the closing day.
    • The person who will submit has the right user access.
  2. Step 2: Find a tender that fits

    Shortlist packages you can deliver by procuring entity, location, method, value and closing date, then read the full notice.

    What to check
    • Procurement nature, method and estimated value.
    • Pre-tender meeting and clarification deadlines.
    • Eligibility conditions you must meet on the day of submission.
  3. Step 3: Identify the STD and its rules

    The STD named in the notice sets eligibility, security, evaluation and contract terms. Look it up here before you price.

    What to check
    • The STD code in the tender notice, e.g. e-PG3 or e-PW2A.
    • The PPR 2025 value limit for that STD.
    • The participation guideline for that STD.
  4. Step 4: Prepare documents, price and security

    Buy the document in e-GP, build a compliance checklist and arrange tender security in the exact amount, form and validity required.

    What to check
    • Document fee and tender security are paid through an e-GP member bank (e-RFQ needs neither).
    • Every form is complete, signed and in the prescribed wording.
    • Beneficial ownership details are ready, as PPR 2025 requires.
  5. Step 5: Submit through e-GP before the deadline

    Upload, map and encrypt every file, then complete final submission well before closing. e-GP does not accept late submissions.

    What to check
    • All mandatory documents are mapped to the right forms.
    • Final submission is complete, not just uploaded.
    • You saved the submission receipt and checked for amendments.
  6. Step 6: Evaluation, award and contract

    The opening and evaluation committees check responsiveness and qualification against the disclosed criteria. The winner receives the NOA in e-GP.

    What to check
    • Answer permitted clarifications on time without changing your offer.
    • Provide performance security and sign the contract within the NOA deadline.
    • The winning tenderer's beneficial ownership is published.
  1. Step 1: Plan the package and strategy

    Confirm the annual procurement plan, budget and funding source, and record a procurement strategy for the package, as PPR 2025 requires.

    What to check
    • The package is in the approved procurement plan.
    • Budget is available for the full contract value.
    • The strategy explains method, packaging and timing.
  2. Step 2: Choose the method and STD

    Match the procurement nature, estimated value and complexity to the right method and the PPR 2025 STD in e-GP.

    What to check
    • The estimate sits inside the STD's value limit.
    • The package is not split to stay under a limit.
    • The STD version is the one currently effective in e-GP.
  3. Step 3: Prepare and approve the document

    Complete specifications, qualification and evaluation criteria, and the official estimate, then get the document approved.

    What to check
    • Criteria are measurable, relevant and not restrictive.
    • Quantities, dates and security amounts agree across the document.
    • No placeholders are left in the STD.
  4. Step 4: Publish and manage clarifications

    Publish the notice in e-GP, hold any pre-tender meeting and issue amendments with enough time for tenderers to respond.

    What to check
    • Lots, fees and security are set up correctly in e-GP.
    • Clarifications are answered to all tenderers.
    • Amendments extend the deadline when needed.
  5. Step 5: Open and evaluate

    Tenders are opened online. The evaluation committee applies only the disclosed criteria and records every decision.

    What to check
    • Responsiveness, qualification and price are checked in order.
    • Works tenders get the significantly low-priced (SLT) test where the STD requires it.
    • The evaluation report is complete and signed.
  6. Step 6: Award, contract and publication

    Get approval, issue the NOA, sign the contract and publish the award, including the winner's beneficial ownership.

    What to check
    • Approval is given within the tender validity period.
    • Performance security is received before signing.
    • The contract award is published in e-GP.
Public Procurement Rules 2025

What changed under PPR 2025 and e-GP

The Public Procurement Rules 2025 replaced the 2008 rules on 28 September 2025, under the Public Procurement Act 2006 as amended by the 2025 ordinance. They have 154 rules and 21 schedules. BPPA (the Bangladesh Public Procurement Authority, formerly CPTU) has reissued the standard tender documents to match, and the e-GP system now lists 30 PPR 2025 STDs and SRFPs with their effective dates.

Key changes

  • e-GP is mandatory for all public procurement.
  • No ±10% price limit for national works; low-priced works tenders are tested against an e-GP price index instead.
  • Beneficial ownership of the winning tenderer must be disclosed and published.
  • Procurement strategy is required, and sustainable public procurement is formally introduced.
  • Physical services are a procurement category of their own.
  • Framework agreements and negotiation are allowed more widely.
  • A Debarment Board is set up, and asset disposal rules are clarified.

Value limits in BPPA's PPR 2025 STDs

RFQ, goods (e-PG1)
Up to Tk. 8 lakh
RFQ, works (e-PW1)
Up to Tk. 15 lakh
RFQ, physical services (e-PPS1BL, e-PPS1BU)
Up to Tk. 15 lakh
Goods OTM/LTM (e-PG2)
Up to Tk. 50 lakh
Goods OTM (e-PG3)
Above Tk. 50 lakh
Works OTM/LTM (e-PW2A, e-PW2B)
Up to Tk. 5 crore
Works OTM (e-PW3)
Above Tk. 5 crore
Consulting firm, simple (e-PS5, e-PS6)
Up to Tk. 1 crore
Consulting firm, complex (e-PS7, e-PS8)
Above Tk. 1 crore

Working in the e-GP system

  • Tenders are published, bought, submitted and opened in e-GP; late submission is not possible.
  • Document fees and tender security are paid through e-GP member banks.
  • e-RFQ documents are free, quotations need no tender or performance security, and the RFQ window is 3 to 7 days.
  • Bidders need an active e-GP registration; e-GP registrations doubled after PPR 2025 made e-GP mandatory.

Always follow the tender notice and its STD. e-GP STD list · BPPA standard documents · e-GP portal

STD guidance cards

Compare the right procurement path before preparing or participating.

Each card summarizes method, nature, budget, threshold, STD name, basic features, the short evaluation flow, and the date the PPR 2025 version took effect in e-GP.

28 guides

Showing guidance

PG1

RFQ / Goods

e-PG1 Goods RFQ

RFQ
Procurement method
Request for Quotation
Procurement nature
Goods
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 8 lakh
STD name
e-PG1
Applicable rule
PPR 2025 · e-GP STD, effective 11 Oct 2025

e-RFQ for readily available low-value goods up to Tk. 8 lakh under PPR 2025 Rule 90. The document is free and quotations are submitted through e-GP.

3 to 7 day submission No tender or performance security Free e-RFQ document
Evaluation overview

Apply the pre-disclosed criteria, check responsiveness, screen for significantly low-priced quotations (PPR 2025 Rules 25-26) and recommend the lowest responsive quotation. Splitting a package to stay under the limit is not allowed.

PW1A

RFQ / Works

e-PW1(a) Works RFQ Unit Rate

RFQ
Procurement method
Request for Quotation
Procurement nature
Works
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 15 lakh
STD name
e-PW1(a)
Applicable rule
PPR 2025 · e-GP STD, effective 11 Oct 2025

Low-value works RFQ where quantities may be measured and paid on unit rates through the e-GP quotation process.

Unit-rate BOQ No tender or performance security 3 to 7 day submission
Evaluation overview

Verify quotation responsiveness, qualification documents, BOQ rates, and recommend the lowest responsive quotationer.

PW1B

RFQ / Works

e-PW1(b) Works RFQ Lump Sum

RFQ
Procurement method
Request for Quotation
Procurement nature
Works
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 15 lakh
STD name
e-PW1(b)
Applicable rule
PPR 2025 · e-GP STD, effective 11 Oct 2025

Low-value simple works document for fixed-scope lump-sum RFQ packages where the total work can be priced clearly.

Lump-sum scope Free e-RFQ document No tender or performance security
Evaluation overview

Confirm scope responsiveness, bidder eligibility, price reasonableness, and lowest responsive quotation.

PG2

OTM or LTM / Goods

e-PG2 Goods Tender

Tk. 50 lakh
Procurement method
OTM or LTM
Procurement nature
Goods
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 50 lakh
STD name
e-PG2
Applicable rule
PPR 2025 · e-GP STD, effective 25 Oct 2025

National goods tender for OTM or LTM packages up to Tk. 50 lakh, submitted, opened and evaluated in the e-GP system.

Tender security via e-GP bank 10% performance security Beneficial ownership disclosure
Evaluation overview

Check responsiveness and qualification, reject tenders priced more than 10% above the official cost estimate, apply the SLT rules and recommend the lowest evaluated responsive tender.

PG3

OTM / Goods

e-PG3 Goods Tender

OTM
Procurement method
Open Tendering Method
Procurement nature
Goods
Budget type
Revenue, development, own fund
Highest cost / threshold
Above Tk. 50 lakh
STD name
e-PG3
Applicable rule
PPR 2025 · e-GP STD, effective 20 Oct 2025

Full open competitive goods tender for larger national packages using electronic submission, opening, evaluation, approval, and award.

Competitive OTM OCE based controls Security required
Evaluation overview

Review responsiveness, eligibility, technical compliance, price, SLT where applicable, and select the LERT.

PG3A

OTM or LTM / Goods

e-PG3A Framework Agreement

Framework
Procurement method
OTM or LTM
Procurement nature
Goods and related services
Budget type
Revenue, development, own fund
Highest cost / threshold
Any value as permitted by method
STD name
e-PG3A
Applicable rule
PPR 2025 · e-GP STD, effective 17 Dec 2025

Framework agreement document (OTM or LTM) for repeat purchases where quantities are uncertain and call-off orders follow. PPR 2025 widens the use of framework agreements.

Call-off orders Repeat purchases Multiple delivery points
Evaluation overview

Evaluate responsiveness, capacity, rates, terms, and select the supplier for framework agreement and future call-offs.

PG9

DPM / Goods

e-PG9 Direct Procurement

DPM
Procurement method
Direct Procurement Method
Procurement nature
Goods
Budget type
Revenue, development, own fund
Highest cost / threshold
Any value (DPM conditions)
STD name
e-PG9
Applicable rule
PPR 2025 · e-GP STD, effective 8 Dec 2025

Direct procurement of goods, for any value, where PPR 2025 permits the Direct Procurement Method and the grounds are recorded.

Justification required No open competition Direct supplier selection
Evaluation overview

Confirm legal justification, supplier eligibility, price reasonableness, approvals, and award documentation.

PG3D

OTM / DP-funded goods

e-PG3D DP Funded Goods

DP
Procurement method
Open Tendering Method
Procurement nature
Goods and related services
Budget type
Development partner funded
Highest cost / threshold
Any value
STD name
e-PG3D
Applicable rule
PPR 2025 · e-GP STD, effective 24 Mar 2026

Goods OTM document for development partner financed projects, for any value, where the financing agreement's procurement framework applies.

DP legal framework Tender security SLT not applicable
Evaluation overview

Follow the financing agreement, evaluate responsiveness and qualifications, and recommend the lowest evaluated responsive tender.

PG4

OTM / Goods (international)

e-PG4 International Goods Tender

International
Procurement method
Open Tendering Method
Procurement nature
Goods and related services
Budget type
Revenue, development, own fund
Highest cost / threshold
Any value
STD name
e-PG4
National / international
International
Applicable rule
PPR 2025 · e-GP STD, effective 1 Dec 2025

International competitive tender for goods of any value, run through the e-GP system when the package is open to foreign suppliers.

International competition Any value Lowest evaluated responsive tender
Evaluation overview

Evaluate eligibility, responsiveness, technical compliance and qualification, convert prices as the document requires, then recommend the lowest evaluated responsive tender.

PG5A

OSTETM / Plant and ICT

e-PG5A Supply and Installation

2-envelope
Procurement method
One Stage Two Envelope
Procurement nature
Plant, equipment, ICT infrastructure
Budget type
Any permitted budget
Highest cost / threshold
Any value
STD name
e-PG5A
National / international
National or international
Applicable rule
PPR 2025 · e-GP STD, effective 12 Apr 2026 (international), 7 May 2026 (national)

Turnkey supply, installation, testing and commissioning of plant and equipment under one-stage two-envelope tendering. e-GP has national and international versions.

Turnkey scope Technical envelope Commissioning focus
Evaluation overview

Evaluate technical proposals first, open only responsive financial offers, then recommend the lowest evaluated responsive tender.

PG8

OSTETM / Goods

e-PG8 Goods Two Envelope

National
Procurement method
One Stage Two Envelope
Procurement nature
Goods and related services
Budget type
Any permitted budget
Highest cost / threshold
Any value
STD name
e-PG8
National / international
National
Applicable rule
PPR 2025 · e-GP STD, effective 7 May 2026

National goods document for technically sensitive procurements where technical proposals are assessed before prices are opened.

Technical first Financial second Security required
Evaluation overview

Only technically responsive bidders continue to financial evaluation, followed by LERT award recommendation.

PW2A

OTM / Works

e-PW2A Works OTM

Works
Procurement method
Open Tendering Method
Procurement nature
Works
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 5 crore
STD name
e-PW2A
Applicable rule
PPR 2025 · e-GP STD, effective 6 Nov 2025

Main open tender works document for contracts up to Tk. 5 crore through e-GP. PPR 2025 removed the old 10% price limit for national works.

Tender security up to 3% of estimate No ±10% price limit SLT by e-GP price index
Evaluation overview

Low-priced tenders are tested against a weighted average of the official estimate (20%), the e-GP national price index (30%) and all quoted prices (50%); tenders below the lower limit are rejected. With only one responsive tender, a deviation over 20% from the estimate makes it non-responsive.

PW2B

LTM / Works

e-PW2B Works LTM

LTM
Procurement method
Limited Tendering Method
Procurement nature
Works
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 5 crore
STD name
e-PW2B
Applicable rule
PPR 2025 · e-GP STD, effective 30 Oct 2025

Limited tendering counterpart for eligible works procurement up to Tk. 5 crore where LTM conditions are satisfied.

Limited competition Security required Works qualification
Evaluation overview

Check invited tenderer eligibility, responsiveness, qualification, BOQ pricing, and LERT award basis.

PW3

OTM / Works

e-PW3 Works OTM

High value
Procurement method
Open Tendering Method
Procurement nature
Works
Budget type
Revenue, development, own fund
Highest cost / threshold
Above Tk. 5 crore
STD name
e-PW3
Applicable rule
PPR 2025 · e-GP STD, effective 11 Oct 2025

High-value works OTM document for contracts above Tk. 5 crore without prequalification unless the package requires another method.

No prequalification Large works LERT award
Evaluation overview

Evaluate responsiveness, experience, capacity, equipment, personnel, financial capacity, and lowest evaluated price.

PW3D

OTM / DP-funded works

e-PW3D DP Funded Works

DP
Procurement method
Open Tendering Method
Procurement nature
Works
Budget type
Development partner funded
Highest cost / threshold
Any value per financing agreement
STD name
e-PW3D
Applicable rule
PPR 2025 · e-GP STD, effective 25 Oct 2025

Works OTM document used when the development partner legal framework governs procurement under the financing agreement.

DP framework Any value No default prequalification
Evaluation overview

Apply financing agreement requirements, evaluate technical and financial responsiveness, and recommend the LERT.

PW3A

OSTETM / Works

e-PW3A Works Two Envelope

Complex
Procurement method
One Stage Two Envelope
Procurement nature
Works
Budget type
Any permitted budget
Highest cost / threshold
Any value
STD name
e-PW3A
Applicable rule
PPR 2025 · e-GP STD, effective 25 Oct 2025

Complex works document for packages where methodology, equipment, personnel, or technical solution matters as much as price.

Technical envelope Qualification review Financial envelope
Evaluation overview

Assess technical proposals and qualifications first, then open financial proposals for responsive tenderers only.

EOI

REOI / Consulting

e-REOI Expression of Interest

Shortlist
Procurement method
Request for Expression of Interest
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Assignment based
STD name
e-REOI
Applicable rule
PPR 2025 · e-GP STD, effective 11 Oct 2025

First-stage document for inviting consulting firms or individual consultants before issuing the relevant RFP or SRFA.

EOI invitation Shortlist creation RFP follows
Evaluation overview

Evaluate expressions of interest against experience and capability criteria, then shortlist qualified consultants.

PS3

SRFA / Individual consultant

e-PS3 Individual Lump Sum

Lump sum
Procurement method
SRFA
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Assignment based
STD name
e-PS3
Applicable rule
PPR 2025 · e-GP STD, effective 20 Nov 2025

Selection document for an individual consultant under a lump-sum contract with defined deliverables and fixed output payment.

Individual expert Deliverable based National coverage
Evaluation overview

Assess qualifications, relevant experience, availability, and suitability against the terms of reference.

PS4

SRFA / Individual consultant

e-PS4 Individual Time Based

Time based
Procurement method
SRFA
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Assignment based
STD name
e-PS4
Applicable rule
PPR 2025 · e-GP STD, effective 20 Nov 2025

Individual consultant selection document where workload, duration, or level of effort cannot be fixed precisely upfront.

Individual expert Actual time payment Flexible level of effort
Evaluation overview

Evaluate CV, specialized expertise, experience, and availability against the time-based assignment requirements.

PS5

RFP / Consulting firm

e-PS5 Simple Lump Sum

Tk. 1 crore
Procurement method
Request for Proposal
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Up to Tk. 1 crore
STD name
e-PS5
Applicable rule
PPR 2025 · e-GP STD, effective 8 Jan 2026

Simple lump-sum RFP for consulting firms where scope and deliverables are clearly defined and payment is output based.

Consulting firm Fixed deliverables Simple assignment
Evaluation overview

Evaluate technical proposal, qualifications, methodology, and financial proposal as required by the selected consultant method.

PS6

RFP / Consulting firm

e-PS6 Simple Time Based

Tk. 1 crore
Procurement method
Request for Proposal
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Up to Tk. 1 crore
STD name
e-PS6
Applicable rule
PPR 2025 · e-GP STD, effective 8 Jan 2026

Simple time-based consulting firm RFP where staff time and reimbursable expenses drive payment.

Staff time payment Consulting firm Simple advisory scope
Evaluation overview

Score technical proposal, proposed team, methodology, and financial proposal following the RFP evaluation method.

PS7

RFP / Consulting firm

e-PS7 Complex Lump Sum

Complex
Procurement method
Request for Proposal
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Above Tk. 1 crore
STD name
e-PS7
Applicable rule
PPR 2025 · e-GP STD, effective 25 Nov 2025

Complex lump-sum RFP for larger consulting firm assignments with clear deliverables and substantial expertise requirements.

High value Complex deliverables Firm selection
Evaluation overview

Conduct detailed technical scoring, financial evaluation, and ranking according to the applicable consultant selection method.

PS8

RFP / Consulting firm

e-PS8 Complex Time Based

Long term
Procurement method
Request for Proposal
Procurement nature
Services
Budget type
Any permitted budget
Highest cost / threshold
Above Tk. 1 crore
STD name
e-PS8
Applicable rule
PPR 2025 · e-GP STD, effective 25 Nov 2025

Complex time-based RFP for high-value, long-term, or advisory assignments where level of effort cannot be fully estimated.

Continuous input Complex assignment Staff time basis
Evaluation overview

Evaluate technical quality, team strength, methodology, work plan, and financial proposal under the RFP method.

PPS2

OTM or LTM / Physical services

e-PPS2 Outsourcing Services

OTM/LTM
Procurement method
OTM or LTM
Procurement nature
Physical services
Budget type
Revenue, development, own fund
Highest cost / threshold
As package approved
STD name
e-PPS2
Applicable rule
PPR 2025 · e-GP STD, effective 30 Oct 2025

Outsourcing document (OTM or LTM) for hiring service personnel such as guards, cleaners, drivers and office assistants. PPR 2025 treats physical services as their own procurement category.

Manpower outsourcing Security required LERT award
Evaluation overview

Evaluate responsiveness, manpower compliance, qualification, financial offer, and lowest evaluated responsive tenderer.

PPS3

OTM or LTM / Physical services

e-PPS3 Other Physical Services

OTM/LTM
Procurement method
OTM or LTM
Procurement nature
Physical services
Budget type
Revenue, development, own fund
Highest cost / threshold
As package approved
STD name
e-PPS3
Applicable rule
PPR 2025 · e-GP STD, effective 1 Dec 2025

Document for physical service outputs other than outsourced personnel, such as maintenance, waste management, or facility services.

Service output scope OTM or LTM Performance security
Evaluation overview

Evaluate service methodology, responsiveness, qualifications, and price before LERT recommendation.

P1BL

RFQ / Physical services

e-PPS1BL RFQ Lump Sum

RFQ
Procurement method
Request for Quotation
Procurement nature
Physical services
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 15 lakh
STD name
e-PPS1BL
Applicable rule
PPR 2025 · e-GP STD, effective 24 Mar 2026

e-RFQ for low-value physical services up to Tk. 15 lakh with a fixed scope and total price (not for hiring outsourced personnel).

Lump-sum service Low value RFQ Fixed scope
Evaluation overview

Check responsiveness, service scope compliance, qualification, and lowest responsive quotation.

P1BU

RFQ / Physical services

e-PPS1BU RFQ Unit Rate

RFQ
Procurement method
Request for Quotation
Procurement nature
Physical services
Budget type
Revenue, development, own fund
Highest cost / threshold
Up to Tk. 15 lakh
STD name
e-PPS1BU
Applicable rule
PPR 2025 · e-GP STD, effective 24 Mar 2026

e-RFQ for physical services up to Tk. 15 lakh paid on measured quantities and unit rates (not for hiring outsourced personnel).

Unit-rate service Variable quantity Measured payment
Evaluation overview

Evaluate quoted unit rates, service responsiveness, qualification, and lowest responsive quotation.

PPS5

DPM / Physical services

e-PPS5 Direct Outsourcing Services

DPM
Procurement method
Direct Procurement Method
Procurement nature
Physical services
Budget type
Revenue, development, own fund
Highest cost / threshold
As legally permitted
STD name
e-PPS5
Applicable rule
PPR 2025 · e-GP STD, effective 3 Aug 2026

Direct procurement of outsourced service personnel, such as guards, cleaners and drivers, where PPR 2025 permits DPM and the grounds are recorded.

Outsourced personnel Justification required Approval driven
Evaluation overview

Confirm the DPM grounds, the provider's eligibility and manpower compliance, price reasonableness under the outsourcing policy, and the required approvals before award.

PPS6

DPM / Physical services

e-PPS6 Direct Physical Services

DPM
Procurement method
Direct Procurement Method
Procurement nature
Physical services
Budget type
Revenue, development, own fund
Highest cost / threshold
As legally permitted
STD name
e-PPS6
Applicable rule
PPR 2025 · e-GP STD, effective 5 Feb 2026

Direct procurement of physical services other than outsourced personnel, where DPM is permitted and justified.

Justification required Approval driven Negotiation permitted
Evaluation overview

Validate DPM grounds, service provider capacity, price reasonableness, and required approvals before award.

For government users

Preparation Guideline

Preparation pages are designed for procuring entities, committee members, approvers, and official users who need to prepare the STD, set criteria, publish through e-GP, and document the approval trail under the Public Procurement Rules 2025.

  • PPR 2025 STD selection, procurement strategy, package setup, threshold checks, and budget fit.
  • Qualification criteria, OCE readiness, security, and timeline controls.
  • Evaluation committee workflow, TER checks, approval, NOA, and contract signing.
For bidders

Participation Guideline

Participation pages are designed for bidders, suppliers, contractors, consultants, and service providers who need to assess eligibility, prepare documents, price carefully, and submit through e-GP.

  • Active e-GP registration, eligibility, experience, tax, BIN/VAT, license, and authorization checks.
  • e-GP document fee or free e-RFQ access, tender security through an e-GP member bank, pricing, forms, and beneficial ownership details.
  • Submission readiness, clarification tracking, evaluation risk, and award follow-up.
Common questions

Frequently asked questions

Short answers on PPR 2025 and e-GP. Open a question to read the answer.

Which STD should I use for my package?

It depends on the procurement nature, method and estimated value. Goods up to Tk. 50 lakh use e-PG2 and above that e-PG3; works up to Tk. 5 crore use e-PW2A (open) or e-PW2B (limited), and above that e-PW3. Use the guidance finder to narrow it down, and always use the STD named in the tender notice.

Do e-RFQ quotations need tender security?

No. Under PPR 2025 the e-RFQ document is free, quotations need no tender or performance security, and the RFQ window is 3 to 7 days. e-RFQ covers goods up to Tk. 8 lakh and works or physical services up to Tk. 15 lakh.

Can I submit a tender after the deadline?

No. e-GP closes submission at the deadline, and slow connections or bank delays do not extend it. Complete the final submission, not just the upload, well before closing.

How are the document fee and tender security paid?

Through an e-GP member bank. Check the amount, form and validity in the tender data sheet: an incorrect security amount, beneficiary or validity can make a tender non-responsive.

Is the ±10% price limit still applied to works tenders?

No. PPR 2025 removed it for national works. Under e-PW2A, a significantly low-priced tender is instead tested against a weighted average of the official estimate (20%), the e-GP price index (30%) and the quoted prices (50%).

What is beneficial ownership disclosure?

PPR 2025 requires the winning tenderer to disclose the people who ultimately own or control it, and that information is published. Keep shareholder and ownership details ready before you bid.

Which version of an STD applies to my tender?

The document attached to the tender in e-GP. Each STD card shows the date its PPR 2025 version took effect in e-GP, and the e-GP STD list (opens in a new tab) has the full list.

Need procurement clarity?

Ask before you prepare or submit.

Browse public procurement answers or submit a new question for tender preparation, bid participation, evaluation, security, and e-GP workflow support.