Closed — this tender closed on 22 September 2026.

Tender ID 1318860

WD-06: CONSTRUCTION OF 10-STORIED ACADEMIC CUM WORKSHOP BUILDING WITH 10-STORIED FOUNDATION INCLUDING SANITARY, WATER SUPPLY, FIRE FIGHTING AND ELECTRIFICATION WORKS AT CHATTAGRAM POLYTECHNIC INSTITUTE, KHULSHI, CHATTOGRAM. (PILE FOUNDATION)

WD-06: CONSTRUCTION OF 10-STORIED ACADEMIC CUM WORKSHOP BUILDING WITH 10-STORIED FOUNDATION INCLUDING SANITARY, WATER SUPPLY, FIRE FIGHTING AND ELECTRIFICATION WORKS AT CHATTAGRAM POLYTECHNIC INSTITUTE, KHULSHI, CHATTOGRAM. (PILE FOUNDATION)

Procurement summary

Procuring entity
Office of the Executive Engineer,EED, Chittagong, District.
Organization
education engineering department
Division
secondary and higher education division
Ministry
ministry of education
Location
Chattogram, Chittagong
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
15Poly/2026-27/WD-6
Package no.
15Poly/2026-27/WD-6
APP ID
228901
Invitation reference no.
37.07.0000.017.19.063.25.26/65; Date: 20.07.2026

Key dates

Published
23 August 2026
Document last selling date
21 September 2026
Pre-tender meeting
24 August 2026
Tender security submission deadline
22 September 2026
Opening date
22 September 2026
Closing date
22 September 2026

Costs and securities

Estimated cost (APP)
BDT 52,44,68,000
Document price
BDT 7,000
Tender security
BDT 1,00,00,000

Funding

Project
Capacity Building 15 Government Polytechnic Institutes
Budget type
Development
Source of funds
Government

Eligibility criteria

Experience Criteria: (a) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 05 (Five) years [years counting backward from the date of publication of IFT in the newspaper]. (b) The minimum specific experience as a Prime Contractor in construction works of at least 01 (one) contract of similar nature, complexity and methods/construction technology successfully completed within the last 05 (five) years, with a value of at least BDT 2,700.00 (Two Thousand and Seven Hundred) lakhs [ years counting backward from the date of publication of IFT in the newspaper]. Financial Criteria: (c) The required average annual construction turnover shall be greater than BDT 3,000.00 (Three Thousand) Lakh per year during the last 05(five) years, totaling BDT 15,000.00 lakh (3000 x 5 = 15,000.00 Lakh [years counting backward from the date of publication of IFT in the newspaper]. (d) The minimum amounts of Liquid Assets shall be at BDT 600…