Tender ID 1333362

River bank protection work along the Right bank of Alai river from km.0.800 to km.1.650 = 850.00 m in connection with "Protection from the Erosion of the Alai River at Pachabahola and Sadipati Area of Melandah Upazila of Jamalpur District" under Jamalpur WD division during the year 2026-2027.

River bank protection work along the Right bank of Alai river from km.0.800 to km.1.650 = 850.00 m in connection with "Protection from the Erosion of the Alai River at Pachabahola and Sadipati Area of Melandah Upazila of Jamalpur District" under Jamalpur WD division during the year 2026-2027.

Procurement summary

Procuring entity
Jamalpur WD Division
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Jamalpur, Jamalpur
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
Alai/ADP/W-02
Package no.
Alai/ADP/W-02
APP ID
232363
Invitation reference no.
42.01.3900.556.07.001.26.1410, Date: 13/09/2026

Key dates

Published
13 September 2026
Document last selling date
5 October 2026
Pre-tender meeting
13 September 2026
Tender security submission deadline
5 October 2026
Opening date
5 October 2026
Closing date
5 October 2026

Costs and securities

Estimated cost (APP)
BDT 15,31,51,900
Document price
BDT 5,000
Tender security
BDT 40,00,000

Funding

Project
Protection from the Erosion of the Alai River at Pachabahola and Sadipati Area of Melandaho Upazila of Jamalpur District
Budget type
Development
Source of funds
Government

Eligibility criteria

a) Tenderer must be registered in the e-GP portal through BPPA along with valid and updated Trade License, VAT Registration,TIN certificate and National ID card. b) Tenderer must be submitted all the documents freshly (without corrupted/blured/distorted). If evaluation committee could be unable to open the file (corrupted) or can't visually read the data, that/thosefile(s) will be rejected. c) VAT & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard. No additional claims will be allowed. d) Contractor should arrange land on his own if needed. He should also follow latest govt rules/acts etc regarding insurance policy of work. e) A detailed list of work in hand/on-going works duly signed by the tenderer must be submitted. f) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will doit at his/her own cost. No extra claim will beentertained in this regard. g)…