River bank protection work along the Left Bank of Alai river from km.1.700 to km.2.115 = 415.00m in connection with "Protection from the Erosion of the Alai River at Pachabahola and Sadipati Area of Melandah Upazila of Jamalpur District" under Jamalpur WD division during the year 2026-2027.
River bank protection work along the Left Bank of Alai river from km.1.700 to km.2.115 = 415.00m in connection with "Protection from the Erosion of the Alai River at Pachabahola and Sadipati Area of Melandah Upazila of Jamalpur District" under Jamalpur WD division during the year 2026-2027.
Procurement summary
- Procuring entity
- Jamalpur WD Division
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Jamalpur, Jamalpur
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- Alai/ADP/W-04
- Package no.
- Alai/ADP/W-04
- APP ID
- 232363
- Invitation reference no.
- 42.01.3900.556.07.001.26.1410, Date: 13/09/2026
Key dates
- Published
- 13 September 2026
- Document last selling date
- 5 October 2026
- Pre-tender meeting
- 13 September 2026
- Tender security submission deadline
- 5 October 2026
- Opening date
- 5 October 2026
- Closing date
- 5 October 2026
Costs and securities
- Estimated cost (APP)
- BDT 7,32,67,315
- Document price
- BDT 4,000
- Tender security
- BDT 20,00,000
Funding
- Project
- Protection from the Erosion of the Alai River at Pachabahola and Sadipati Area of Melandaho Upazila of Jamalpur District
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
a) Tenderer must be registered in the e-GP portal through BPPA along with valid and updated Trade License, VAT Registration,TIN certificate and National ID card. b) Tenderer must be submitted all the documents freshly (without corrupted/blured/distorted). If evaluation committee could be unable to open the file (corrupted) or can't visually read the data, that/thosefile(s) will be rejected. c) VAT & IT will be deducted as per the prevailing government rate. No extra claim will be entertained in this regard. No additional claims will be allowed. d) Contractor should arrange land on his own if needed. He should also follow latest govt rules/acts etc regarding insurance policy of work. e) A detailed list of work in hand/on-going works duly signed by the tenderer must be submitted. f) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will doit at his/her own cost. No extra claim will beentertained in this regard. g)…