Construction of Gainbari RCC Slab Bridge (2 X 9.00m) 18.75m long at Ch: 8+504.50m and Soling - HBB, Earth work in embankment & Protective Work from Ch. 8+400m (Bethkashi Khaya Ghat) to Ch. 18+400m (Sonakhali) (Length = 10000.00m) of Koyra-Noabaki-Shyamnagar Road (Z-7610) under Satkhira Road Division during the Financial Year 2026-2027.
Construction of Gainbari RCC Slab Bridge (2 X 9.00m) 18.75m long at Ch: 8+504.50m and Soling - HBB, Earth work in embankment & Protective Work from Ch. 8+400m (Bethkashi Khaya Ghat) to Ch. 18+400m (Sonakhali) (Length = 10000.00m) of Koyra-Noabaki-Shyamnagar Road (Z-7610) under Satkhira Road Division during the Financial Year 2026-2027.
Procurement summary
- Procuring entity
- Satkhira Road Division
- Organization
- roads & highways department (rhd)
- Division
- road transport and highways division
- Ministry
- ministry of road transport and bridges
- Location
- Satkhira, Satkhira
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- e-GP/02/OTM/PMP-Major/Bridge/Sat/RHD/2026-2027
Key dates
- Published
- 30 September 2026
- Document last selling date
- 28 October 2026
- Tender security submission deadline
- 29 October 2026
- Closing date
- 29 October 2026
Costs and securities
- Estimated cost (APP)
- BDT 24,60,00,000
- Document price
- BDT 5,000
- Tender security
- BDT 51,70,000
Funding
- Budget type
- Revenue
Eligibility criteria
1) The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years. 2) The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in Road construction Work including Bridge work under the public sector successfully completed within the last 20 (twenty) years with a value of at least Tk. 12 (Twelve) Crore in Maxium 02 (Two) contracts. N:B: The Construction of RCC/PC Girder bridge experience may be in a separate contract. 3) The required average annual construction turnover shall be greater than Tk 24.00 (Twenty Four) crore over the best Five [5] financial years in the last Ten [10] financial years. 4) The minimum amount of financial resources as liquid asset or working capital or credit line(s) or specific credit commitment or in any combination of them, of the Tenderers shall be Tk 06.00 (Six) crore. 5) The minimum capacity shall be:…