Installation of air conditioning systems under the project titled Upgrading existing kidney dialysis centers in medical college hospitals to 50 beds and establishing 10-bed kidney dialysis centers in district sadar hospitals (2nd Revised).
Installation of air conditioning systems under the project titled Upgrading existing kidney dialysis centers in medical college hospitals to 50 beds and establishing 10-bed kidney dialysis centers in district sadar hospitals (2nd Revised).
Procurement summary
- Procuring entity
- Meherpur PWD Division
- Organization
- public works department (pwd)
- Ministry
- ministry of housing and public works
- Location
- Meherpur, Meherpur
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- egp/meherpur/special/hospital/14/26-27
Key dates
- Published
- 1 October 2026
- Document last selling date
- 13 October 2026
- Tender security submission deadline
- 14 October 2026
- Closing date
- 14 October 2026
Costs and securities
- Document price
- BDT 500
- Tender security
- BDT 17,500
Funding
- Budget type
- Revenue
Eligibility criteria
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor shall be 05 (Five) years. ii) A satisfactory completion of a simillar nature of work of at least Tk 4.50 Lac under 01 contract over a period of 05 years; years counting backward from the date of publication of IFT in the newspaper. iii) The tenderer shall have minimum average annual construction Turnover of Tk. 15.00 Lac during the last 5 years preceding the date of invitation of the tender.The Tenderer must submit a summarized Turnover Calculation sheet of last 5 years. iv) The minimum amount of free fund (Liquid asset) or working capital or credit facilities of the tenderer shall be Tk. 4.50 lac. Document submitted along with the tender must be issued in between publication date and submission date of the tender. v) The minimum Tender Capacity shall be NA. i) Maximum value of Works performed in any 1 year during last 5 years and ii) Value of Existing commitments and works…