Remaining Works of River Bank Protection work from km 247.250 to km 247.400 = 0.150 km to protect Rajapur Union from erosion of the Meghna River at Bhola Sadar Upazila in c/w "Protection of Bhola Sadar Upazila from Erosion of the Meghna River" under Bhola O&M Division-I, BWDB, Bhola (BS-RP-RBP-04/ Remaining /Lot-3)
Remaining Works of River Bank Protection work from km 247.250 to km 247.400 = 0.150 km to protect Rajapur Union from erosion of the Meghna River at Bhola Sadar Upazila in c/w "Protection of Bhola Sadar Upazila from Erosion of the Meghna River" under Bhola O&M Division-I, BWDB, Bhola (BS-RP-RBP-04/ Remaining /Lot-3)
Procurement summary
- Procuring entity
- Bhola WD Division-1
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Bhola, Bhola
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- BS-RP-RBP-04/Remaining/Lot - 3
- Package no.
- BS-RP-RBP-04/Remaining/Lot - 3
- APP ID
- 234509
- Invitation reference no.
- T-2/417, Dated: 17-10-2026
Key dates
- Published
- 26 October 2026
- Document last selling date
- 23 November 2026
- Pre-tender meeting
- 26 October 2026
- Tender security submission deadline
- 23 November 2026
- Opening date
- 23 November 2026
- Closing date
- 23 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 14,81,00,000
- Document price
- BDT 5,000
- Tender security
- BDT 35,00,000
Funding
- Project
- Protection of Bhola Sadar Upazila from Erosion of the Meghna River
- Budget type
- Development
- Source of funds
- Government
Eligibility criteria
1) Tenderer must be registered in the e-GP portal through CPTU along with valid and updated Trade License, VAT Registration and TIN certificate. 2) Payment shall be made subject to availability of fund. 3) All Non-life insurance for any public property, or risks or liabilities pertaining to public property, shall be taken through Sadharon Bima Corporation in accordance with the Insurance Corporation Act, 2019. 4) It is the duty of contractor to submit all the documents freshly (without corrupted). If any documents get corrupted and evaluation committee could not be able to open the file, no claim from the tenderer will be entertained regarding the file. 5) A detailed list of work in hand/on-going works duly signed by the tenderer must be submitted. 6) If any kind of obstacles/structures is needed to dismantle to execute the work as per design and specification the tenderer will do this at his/her own arrangement and cost. No extra claim will be entertained in this regard. 7) If BWDB o…