Slope Protection work along the right bank of Karatoa River from km 75.720 to km: 75.970 = 0.250 Km in connection with "Karotoa River System Improvement Project" in upazila Sadar of District Bogura, Under Bogura WD Division BWDB, Bogura.
Slope Protection work along the right bank of Karatoa River from km 75.720 to km: 75.970 = 0.250 Km in connection with "Karotoa River System Improvement Project" in upazila Sadar of District Bogura, Under Bogura WD Division BWDB, Bogura.
Procurement summary
- Procuring entity
- Bogura WD Division
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Bogura, Bogura
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- KSPW-BOG/W-56
Key dates
- Published
- 20 October 2026
- Document last selling date
- 10 November 2026
- Tender security submission deadline
- 11 November 2026
- Closing date
- 11 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 5,60,14,700
- Document price
- BDT 4,000
- Tender security
- BDT 15,60,000
Funding
- Project
- Karatoa River System Improvement Project
- Budget type
- Development
Eligibility criteria
1. Eligible e-GP Tenderers fulfilling the requirements of STD, TDS and PPR-2025, with valid Trade License, TIN and required documents, may participate. 2. Only Work/Payment Certificates issued or authenticated by the concerned Procuring Entity (PE) shall be considered for turnover calculation. 3. Payment, including R/A Bills, shall be subject to availability of budget allocation and release of funds. No additional claim or interest for payment delay shall be entertained as per Contract provisions. 4. The Contractor shall maintain required work progress as per the approved work programme and Contract. 5. The latest applicable BWDB Technical Specifications, Particular Specifications and relevant guidelines shall govern the Works. 6. Design/drawings may be revised, if required, and BOQ quantities may increase or decrease as per Contract provisions. 7. Pre-work and post-work measurements shall be taken by the BWDB Taskforce and authorized Engineer-in-Charge. Final payment shall be based o…