Tender ID 1358192

Slope Protection work along the right bank of Karatoa River from km 75.720 to km: 75.970 = 0.250 Km in connection with "Karotoa River System Improvement Project" in upazila Sadar of District Bogura, Under Bogura WD Division BWDB, Bogura.

Slope Protection work along the right bank of Karatoa River from km 75.720 to km: 75.970 = 0.250 Km in connection with "Karotoa River System Improvement Project" in upazila Sadar of District Bogura, Under Bogura WD Division BWDB, Bogura.

Procurement summary

Procuring entity
Bogura WD Division
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Bogura, Bogura
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
KSPW-BOG/W-56

Key dates

Published
20 October 2026
Document last selling date
10 November 2026
Tender security submission deadline
11 November 2026
Closing date
11 November 2026

Costs and securities

Estimated cost (APP)
BDT 5,60,14,700
Document price
BDT 4,000
Tender security
BDT 15,60,000

Funding

Project
Karatoa River System Improvement Project
Budget type
Development

Eligibility criteria

1. Eligible e-GP Tenderers fulfilling the requirements of STD, TDS and PPR-2025, with valid Trade License, TIN and required documents, may participate. 2. Only Work/Payment Certificates issued or authenticated by the concerned Procuring Entity (PE) shall be considered for turnover calculation. 3. Payment, including R/A Bills, shall be subject to availability of budget allocation and release of funds. No additional claim or interest for payment delay shall be entertained as per Contract provisions. 4. The Contractor shall maintain required work progress as per the approved work programme and Contract. 5. The latest applicable BWDB Technical Specifications, Particular Specifications and relevant guidelines shall govern the Works. 6. Design/drawings may be revised, if required, and BOQ quantities may increase or decrease as per Contract provisions. 7. Pre-work and post-work measurements shall be taken by the BWDB Taskforce and authorized Engineer-in-Charge. Final payment shall be based o…