Closed — this tender closed on 17 November 2026.

Tender ID 1359238

Construction of 3-vent (Vent Size-1.50m X 1.80m) Regulator at Vandargaon Khal in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kashiaish Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram.

Construction of 3-vent (Vent Size-1.50m X 1.80m) Regulator at Vandargaon Khal in connection with "Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District" at Kashiaish Union, Upazilla: Patiya, Dist. Chattogram under Chattogram WD Division-1, BWDB, Chattogram.

Procurement summary

Procuring entity
Chattogram WD Division-1, BWDB
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Chattogram, Chattogram
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
Reg-07/Vandargaon/Patiya-FCDI/2026-27

Key dates

Published
25 October 2026
Document last selling date
16 November 2026
Tender security submission deadline
17 November 2026
Closing date
17 November 2026

Costs and securities

Estimated cost (APP)
BDT 14,11,00,000
Document price
BDT 5,000
Tender security
BDT 35,00,000

Funding

Project
Flood Control, Drainage and Irrigation Project at Patiya Upazilla in Chittagong District.
Budget type
Development

Eligibility criteria

All tenderers must be registered with CPTU via the e-GP portal. Tenderers must satisfy all criteria in the TDS and must not be blacklisted/debarred by BWDB or any government entity. All requisite documents specified in the TDS must be submitted , failing which the tender will be summarily rejected. Liquid asset certificate must strictly follow the format given in the tender document. Tenderers must inspect the site at their own cost to evaluate actual field conditions and quote rates accordingly. After contract award, no claim or request for variation, extra-rate work or additional payment due to site conditions will be entertained under any circumstances. Land arrangements for access, labor sheds, campsite, material stacking, or diversion must be managed solely by the contractor at their own cost; no claim or assistance will be provided by BWDB. The quantity of work may increase, decrease, or be dropped entirely without any entitlement to claims or rate revisions. The contractor must…