Engaging Oil Purification machine for centrifuging of 1600 KVA Transformer of River Pumping Plant & Supplying of Lubricant For Running Operation of Pumps of River Pumping Plant (RPP) & Repair & Maintenance works of M1D3C2(2-vent), M1D6C1 (5-vent) & M1D8C1(6-vent) Regulator etc. Complete in connection with Halda Extension Irrigation Sub-project at Upazila-Hathazari, Dist.- Chattogram under Operational Expenditure for Repair & Maintenance of goods & services (Economic Code No 3258137) under Chittagong WD Division-1, BWDB, Chittagong during the fiscal year 2026-2027.
Engaging Oil Purification machine for centrifuging of 1600 KVA Transformer of River Pumping Plant & Supplying of Lubricant For Running Operation of Pumps of River Pumping Plant (RPP) & Repair & Maintenance works of M1D3C2(2-vent), M1D6C1 (5-vent) & M1D8C1(6-vent) Regulator etc. Complete in connection with Halda Extension Irrigation Sub-project at Upazila-Hathazari, Dist.- Chattogram under Operational Expenditure for Repair & Maintenance of goods & services (Economic Code No 3258137) under Chittagong WD Division-1, BWDB, Chittagong during the fiscal year 2026-2027.
Procurement summary
- Procuring entity
- Chattogram WD Division-1, BWDB
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Chattogram, Chattogram
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- NDR-04/Hathazari/ME/2026-27
Key dates
- Published
- 1 November 2026
- Document last selling date
- 11 November 2026
- Tender security submission deadline
- 11 November 2026
- Closing date
- 11 November 2026
Costs and securities
- Estimated cost (APP)
- BDT 19,10,000
- Document price
- BDT 1,000
- Tender security
- BDT 50,000
Funding
- Budget type
- Revenue
Eligibility criteria
All tenderers must be registered with CPTU via the e-GP portal. Tenderers must satisfy all criteria in the TDS and must not be blacklisted/debarred by BWDB or any government entity. All requisite documents specified in the TDS must be submitted , failing which the tender will be summarily rejected. Liquid asset certificate must strictly follow the format given in the tender document. Tenderers must inspect the site at their own cost to evaluate actual field conditions and quote rates accordingly. After contract award, no claim or request for variation, extra-rate work or additional payment due to site conditions will be entertained under any circumstances. Land arrangements for access, labor sheds, campsite, material stacking, or diversion must be managed solely by the contractor at their own cost; no claim or assistance will be provided by BWDB. The quantity of work may increase, decrease, or be dropped entirely without any entitlement to claims or rate revisions. The contractor must…