Closed — this tender closed on 16 November 2026.

Tender ID 1366456

Repair of Embankment along the Left Bank of Halda River in between Km 43.300 to Km 43.420 = 72.00 m in Sundarpur Union of Fatikchhari Upazila, District: Chattogram under "Operational Expenditure for Repair and Maintenance of Goods and Services" (E.C. 3258137) under Chittagong WD Division-1, BWDB, Chattogram During the Year 2026-2027.

Repair of Embankment along the Left Bank of Halda River in between Km 43.300 to Km 43.420 = 72.00 m in Sundarpur Union of Fatikchhari Upazila, District: Chattogram under "Operational Expenditure for Repair and Maintenance of Goods and Services" (E.C. 3258137) under Chittagong WD Division-1, BWDB, Chattogram During the Year 2026-2027.

Procurement summary

Procuring entity
Chattogram WD Division-1, BWDB
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Chattogram, Chattogram
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
NDR-08/Fatikchari/Rep-embt/2026-27

Key dates

Published
5 November 2026
Document last selling date
16 November 2026
Tender security submission deadline
16 November 2026
Closing date
16 November 2026

Costs and securities

Estimated cost (APP)
BDT 20,00,000
Document price
BDT 1,000
Tender security
BDT 50,000

Funding

Budget type
Revenue

Eligibility criteria

All tenderers must be registered with CPTU via the e-GP portal. Tenderers must satisfy all criteria in the TDS and must not be blacklisted/debarred by BWDB or any government entity. All requisite documents specified in the TDS must be submitted , failing which the tender will be summarily rejected. Liquid asset certificate must strictly follow the format given in the tender document. Tenderers must inspect the site at their own cost to evaluate actual field conditions and quote rates accordingly. After contract award, no claim or request for variation, extra-rate work or additional payment due to site conditions will be entertained under any circumstances. Land arrangements for access, labor sheds, campsite, material stacking, or diversion must be managed solely by the contractor at their own cost; no claim or assistance will be provided by BWDB. The quantity of work may increase, decrease, or be dropped entirely without any entitlement to claims or rate revisions. The contractor must…