Tender ID 1359590

Repair of Embankment with Temporary Slope Protection Work from Km. 78.600 to Km. 79.500 Total 0.900 Km on Right Bank of Shakbaria River at Pobna Closure in Maharajpur Union Polder No. 13-14/2 of Koyra Upazilla under Operation & Maintenance Budget of Khulna WD Division-2, BWDB, Khulna during the year 2026-2027.

Repair of Embankment with Temporary Slope Protection Work from Km. 78.600 to Km. 79.500 Total 0.900 Km on Right Bank of Shakbaria River at Pobna Closure in Maharajpur Union Polder No. 13-14/2 of Koyra Upazilla under Operation & Maintenance Budget of Khulna WD Division-2, BWDB, Khulna during the year 2026-2027.

Procurement summary

Procuring entity
Khulna WD Division-2
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Khulna, Khulna
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
KHU2/NDR 2026-27/04
Package no.
KHU2/NDR 2026-27/04
APP ID
227745
Invitation reference no.
42.01.4700.605.07.003.24-1509, Dt: 24/11/26

Key dates

Published
25 November 2026
Document last selling date
1 December 2026
Pre-tender meeting
25 November 2026
Tender security submission deadline
2 December 2026
Opening date
2 December 2026
Closing date
2 December 2026

Costs and securities

Estimated cost (APP)
BDT 90,00,000
Document price
BDT 2,500
Tender security
BDT 2,25,000

Funding

Budget type
Revenue
Source of funds
Government

Eligibility criteria

1. All the e-gp enlisted contractor satisfying the criteria mentioned in e-PW2A document attached herewith as per latest PPR-2025 can participate in the tender. 2. Detail Turnover Calculation sheet mentioning the Name of Work, PE name etc (Year wise over the last five years) duly signed by the Tenderer must be submitted with the tender. 3. Payment will be made upon availability of fund. For this, no claim will be entertained. 4. The tenderer shall submit the information of existing works/Commitments as per the attached form no. BWDB-PW3-2A uploaded at Sec-8. 5. The tenderer MUST submit the Line of Credit from any scheduled bank of Bangladesh in the specified supplied format. (Copy supplied, See sec-8) 6. It is the duty of the tenderer to submit all the documents freshly (Without Corrupted). If any documents get corrupted and the evaluation team could not be able to open the file, no claim from the tenderer regarding the file will be entertained. 7. VAT & IT from bill will be as per pr…