Repair of Embankment with Precautionary Protective Work from km 20.500 to km 20.540 Total 0.040 km on left bank of Dhaki river at Kamarkhola in Kamarkhola union under Polder No. 32 of Dacope upazila under of Khulna WD Division-2, BWDB, Khulna.
Repair of Embankment with Precautionary Protective Work from km 20.500 to km 20.540 Total 0.040 km on left bank of Dhaki river at Kamarkhola in Kamarkhola union under Polder No. 32 of Dacope upazila under of Khulna WD Division-2, BWDB, Khulna.
Procurement summary
- Procuring entity
- Khulna WD Division-2
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Khulna, Khulna
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- KHU2/NDR 2026-27/05
- Package no.
- KHU2/NDR 2026-27/05
- APP ID
- 227745
- Invitation reference no.
- 42.01.4700.605.07.003.24-1510, Dt: 24/11/26
Key dates
- Published
- 25 November 2026
- Document last selling date
- 1 December 2026
- Pre-tender meeting
- 25 November 2026
- Tender security submission deadline
- 2 December 2026
- Opening date
- 2 December 2026
- Closing date
- 2 December 2026
Costs and securities
- Document price
- BDT 1,500
- Tender security
- BDT 75,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
1. All the e-gp enlisted contractor satisfying the criteria mentioned in e-PW2A document attached herewith as per latest PPR-2025 can participate in the tender. 2. Detail Turnover Calculation sheet mentioning the Name of Work, PE name etc (Financial Year wise) duly signed by the Tenderer must be submitted with the tender. 3. Payment will be made upon availability of fund. For this, no claim will be entertained. 4. The tenderer shall submit the information of existing works/Commitments as per the attached form no. BWDB-PW3-2A uploaded at Sec-8. 5. The tenderer MUST submit the Line of Credit from any scheduled bank of Bangladesh in the specified supplied format. (Copy supplied, See sec-8) 6. It is the duty of the tenderer to submit all the documents freshly (Without Corrupted). If any documents get corrupted and the evaluation team could not be able to open the file, no claim from the tenderer regarding the file will be entertained. 7. VAT & IT from bill will be as per prevailing Govern…