Re-excavation of Bashukhali Khal from km. 0.000 to km. 3.000 Total 3.000 km. at Polder no. 9 in Paikgacha, Khulna under Khulna WD Division-2 during the year 2026-2027.
Re-excavation of Bashukhali Khal from km. 0.000 to km. 3.000 Total 3.000 km. at Polder no. 9 in Paikgacha, Khulna under Khulna WD Division-2 during the year 2026-2027.
Procurement summary
- Procuring entity
- Khulna WD Division-2
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Khulna, Khulna
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- KHU2/NDR 2026-27/06
- Package no.
- KHU2/NDR 2026-27/06
- APP ID
- 227745
- Invitation reference no.
- Memo: 42.01.4700.605.07.003.24-1545, Dt: 26/11/26
Key dates
- Published
- 26 November 2026
- Document last selling date
- 13 December 2026
- Pre-tender meeting
- 26 November 2026
- Tender security submission deadline
- 14 December 2026
- Opening date
- 14 December 2026
- Closing date
- 14 December 2026
Costs and securities
- Document price
- BDT 2,500
- Tender security
- BDT 3,24,000
Funding
- Budget type
- Revenue
- Source of funds
- Government
Eligibility criteria
1. Payment of work will be made on available of budget & fund release.For this no Claim/interest of Delaying of Payment will be entertained. 2. Spoil earth management will followed as per instruction of Engineer in Charge 3. Quantity of tender item may increase or decrease 4. Prework or Postwork will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the measurement taken by taskforce. 5. The selected contractor will hand over total site at a time. No scope to handover site partly. 6. Silt will be removed by contractor untill the final measurement is taken. Otherwise final post work will be taken above the silt. 7.The contractor will bear the expense to remove of illegal occupancy/structurse if remain besides the river 8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor. 9. The design may be changed/ altered. 10. All the liability of contractor personnel will be borne by contractor.