Tender ID 1382310

Re-excavation of Bashukhali Khal from km. 0.000 to km. 3.000 Total 3.000 km. at Polder no. 9 in Paikgacha, Khulna under Khulna WD Division-2 during the year 2026-2027.

Re-excavation of Bashukhali Khal from km. 0.000 to km. 3.000 Total 3.000 km. at Polder no. 9 in Paikgacha, Khulna under Khulna WD Division-2 during the year 2026-2027.

Procurement summary

Procuring entity
Khulna WD Division-2
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Khulna, Khulna
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
KHU2/NDR 2026-27/06
Package no.
KHU2/NDR 2026-27/06
APP ID
227745
Invitation reference no.
Memo: 42.01.4700.605.07.003.24-1545, Dt: 26/11/26

Key dates

Published
26 November 2026
Document last selling date
13 December 2026
Pre-tender meeting
26 November 2026
Tender security submission deadline
14 December 2026
Opening date
14 December 2026
Closing date
14 December 2026

Costs and securities

Document price
BDT 2,500
Tender security
BDT 3,24,000

Funding

Budget type
Revenue
Source of funds
Government

Eligibility criteria

1. Payment of work will be made on available of budget & fund release.For this no Claim/interest of Delaying of Payment will be entertained. 2. Spoil earth management will followed as per instruction of Engineer in Charge 3. Quantity of tender item may increase or decrease 4. Prework or Postwork will be taken by taskforce and BWDB's concern engineer in charge. Final payment will be made on the measurement taken by taskforce. 5. The selected contractor will hand over total site at a time. No scope to handover site partly. 6. Silt will be removed by contractor untill the final measurement is taken. Otherwise final post work will be taken above the silt. 7.The contractor will bear the expense to remove of illegal occupancy/structurse if remain besides the river 8 Cost of interim and post work survey and more video beyond schedule (if applicable) will be borne by contractor. 9. The design may be changed/ altered. 10. All the liability of contractor personnel will be borne by contractor.