Construction of Protective work from Km 15.990 to Km 16.500 = 510.00 m at Thanaghata-Hazrakhali in Polder No. 4, Upazilla- Assasuni, Dist. Satkhira in connection with "Disaster Risk Management Enhancement Project (Component-1, BWDB Part)" under Satkhira O&M Division-2, BWDB, Satkhira during the year 2021-2022./ Remaining Work/Lot-01.
Construction of Protective work from Km 15.990 to Km 16.500 = 510.00 m at Thanaghata-Hazrakhali in Polder No. 4, Upazilla- Assasuni, Dist. Satkhira in connection with "Disaster Risk Management Enhancement Project (Component-1, BWDB Part)" under Satkhira O&M Division-2, BWDB, Satkhira during the year 2021-2022./ Remaining Work/Lot-01.
Procurement summary
- Procuring entity
- Satkhira WD Division-2
- Organization
- bangladesh water development board (bwdb)
- Ministry
- ministry of water resources
- Location
- Satkhira, Satkhira
- Procurement nature
- Works
- Procurement type
- NCT
- Procurement method
- Open Tendering Method (OTM)
- Lot
- DRMEP/Sat-02/RW/LT-01
- Package no.
- DRMEP/Sat-02/RW/LT-01
- APP ID
- 235972
- Invitation reference no.
- T-3/1853 Date: 18/11/2026
Key dates
- Published
- 23 November 2026
- Document last selling date
- 17 December 2026
- Pre-tender meeting
- 23 November 2026
- Tender security submission deadline
- 17 December 2026
- Opening date
- 17 December 2026
- Closing date
- 17 December 2026
Costs and securities
- Estimated cost (APP)
- BDT 16,97,00,000
- Document price
- BDT 5,000
- Tender security
- BDT 50,00,000
Funding
- Project
- Disaster Risk Management Enhancement Project (Component-1, BWDB Part)
- Budget type
- Development
- Source of funds
- Aid or Grant
Eligibility criteria
1) All tenderer must be registered in e-gp portal system. 2) Payment will be made upon availability of fund; no claim will be entertained. 3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and the evaluation team is unable to open the file, no claim will be considered. 4) VAT & IT from bill will be deducted as per prevailing Government Rate. 5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will do this at his own expense.No extra claims will be considered. 6) The tenderer must follow the latest instructions and formats of CPTU. 7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his own expense and planning. 8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor's own cost. 9) Quantity of work may extr…