Tender ID 1376861

DRMEP/Sat-02/RW/LT-02 Construction of Protective work from Km 16.500 to Km 17.150 = 650 m at Thanaghata-Hazrakhali in Polder No. 4, Upazilla- Assasuni, Dist. Satkhira in connection with "Disaster Risk Management Enhancement Project (Component-1, BWDB Part)" under Satkhira O&M Division-2, BWDB, Satkhira during the year 2021-2022./ Remaining Work/Lot-02.

DRMEP/Sat-02/RW/LT-02 Construction of Protective work from Km 16.500 to Km 17.150 = 650 m at Thanaghata-Hazrakhali in Polder No. 4, Upazilla- Assasuni, Dist. Satkhira in connection with "Disaster Risk Management Enhancement Project (Component-1, BWDB Part)" under Satkhira O&M Division-2, BWDB, Satkhira during the year 2021-2022./ Remaining Work/Lot-02.

Procurement summary

Procuring entity
Satkhira WD Division-2
Organization
bangladesh water development board (bwdb)
Ministry
ministry of water resources
Location
Satkhira, Satkhira
Procurement nature
Works
Procurement type
NCT
Procurement method
Open Tendering Method (OTM)
Lot
DRMEP/Sat-02/RW/LT-02
Package no.
DRMEP/Sat-02/RW/LT-02
APP ID
235972
Invitation reference no.
T-3/1854 Date: 18/11/2026

Key dates

Published
23 November 2026
Document last selling date
17 December 2026
Pre-tender meeting
23 November 2026
Tender security submission deadline
17 December 2026
Opening date
17 December 2026
Closing date
17 December 2026

Costs and securities

Estimated cost (APP)
BDT 14,62,00,000
Document price
BDT 5,000
Tender security
BDT 40,00,000

Funding

Project
Disaster Risk Management Enhancement Project (Component-1, BWDB Part)
Budget type
Development
Source of funds
Aid or Grant

Eligibility criteria

1) All tenderer must be registered in e-gp portal system. 2) Payment will be made upon availability of fund; no claim will be entertained. 3) It is the tenderer's responsibility to submit all documents in their original form. If any documents become corrupted and the evaluation team is unable to open the file, no claim will be considered. 4) VAT & IT from bill will be deducted as per prevailing Government Rate. 5) If any type of Structure/Obstrucle is needed to dismantle to execute the work as per Design & Specification, the tenderer will do this at his own expense.No extra claims will be considered. 6) The tenderer must follow the latest instructions and formats of CPTU. 7) If BWDB owned land is not sufficient to execute the work as per design & Specification, the bidder will do this at his own expense and planning. 8) It is mandatory to submit video and still photographs of the said work in pre-work and post work condition to PE at contractor's own cost. 9) Quantity of work may extr…